My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-05_PERMIT FILE - C1982057
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2013-11-05_PERMIT FILE - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:36:56 PM
Creation date
12/12/2013 12:43:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
11/5/2013
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : <br />24- Jun -13 <br />Permit <br />C- 1982 -057 Site: Seneca II -W Mine <br />User: <br />JLE <br />I State : Colorado <br />Filename: <br />C057 -OOg County: Routt <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Midterm Review No. 6 (MT6) <br />Topsoil Replacement Tasks - Tasks 050 -075 <br />Task <br />Task Description <br />TASK HOURS <br />DIRECT COST <br />050 <br />Replace Topsoil from Stockpile I to Shop and Explosives Site <br />Rev. MT6 <br />21.12 <br />$34,842 <br />051 <br />Replace Topsoil from Stockpile I to Permanent Road A <br />Rev. MT6 <br />31.41 <br />$51,141 <br />052 <br />Replace Topsoil from Stockpile J to Final Pit Area <br />Rev. MT6 <br />98.52 <br />$160,418 <br />053 <br />054 <br />Replace Topsoil from Stockpile J to Haul Road H <br />Replace Topsoil from Stockpile J to Haul Road I <br />Rev. MT6 <br />Rev. MT6 <br />28.19 <br />36.04 <br />C 87.19 <br />! $45,901 <br />$58,673 <br />055 <br />Replace Topsoil from Stockpile P2 to Final Pit Area <br />Rev. MT6 <br />$141,961 <br />056 <br />Replace Topsoil from Stockpile AA to Permanent Road ME <br />Rev. MT6 <br />61.14 <br />$99,541 <br />057 <br />Replace Topsoil from Stockpile BB to Permanent Road A <br />Rev. MT6 <br />1.91 <br />$3,105 <br />058 <br />Replace Topsoil from Stockpile BB to Permanent Road A <br />Rev. MT6 <br />35.43 <br />$57,683 <br />059 <br />Replace Topsoil from Stockpile BB to Final Pit Area <br />Rev. MT6 <br />21.33 <br />$34,733 <br />060 <br />Replace Topsoil from Stockpile CC to Final Pit Area <br />Rev. MT6 <br />46.22 <br />$75,255 <br />061 <br />Replace Topsoil from Stockpile FF to Final Pit Area <br />Rev. MT6 <br />6.92 <br />$11,262 <br />062 <br />Replace Topsoil from Stockpile HH to Final Pit Area <br />Rev. MT6 <br />3.69 <br />$6,005 <br />063 <br />Replace Topsoil from Stockpile JJ to Final Pit Area <br />Rev. MT6 <br />35.89 <br />$58,438 <br />064 <br />Replace Topsoil from Stockpile KK to Pond 009 <br />Rev. MT6 <br />19.39 <br />$31,578 <br />065 <br />Replace Topsoil from Stockpile PP to Permanent Road G <br />Rev. MT6 <br />19.39 <br />$31,578 <br />066 <br />Replace Topsoil from Stockpile QQ to Permanent Road G <br />Rev. MT6 <br />9.13 <br />$14,872 <br />067 <br />Replace Topsoil from Stockpile RR to Permanent Road G <br />Rev. MT6 <br />6.23 <br />$10,151 <br />068 <br />Replace Topsoil from Stockpile SS to Permanent Road G <br />Rev. MT6 <br />6.23 $10,151 <br />069 <br />Replace Topsoil from Stockpile TT to Haul Road J <br />Rev. MT6 <br />1 <br />16.53 <br />$26,913 <br />070 <br />Replace Topsoil from Stockpile UU to Haul Road I <br />Rev. MT6 <br />_ <br />8.58 <br />$13,967 <br />071 <br />Replace Topsoil from Stockpile VV to Final Pit Area <br />Rev. MT6 <br />56.24---- <br />52.06 <br />$91,574 <br />072 <br />Replace Topsoil from Stockpile WW to Final Pit Area <br />Rev. MT6 <br />$84,768 <br />073 <br />Replace Topsoil from Stockpile XX to Final Pit Area <br />Rev. MT6 <br />81.13 <br />$132,102 <br />074 <br />Replace Topsoil from Stockpile YY to Haul Road L <br />Rev. MT6 <br />90.68 <br />1 __$147,644 <br />075 <br />Replace Topsoil from Stockpile YY to Final Pit Area <br />Rev. MT6 <br />78.82 _ <br />I $128,337 <br />Total Direct Cost <br />959.41 <br />$1,562,592 <br />JLE page 7 of 13 6/26/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.