Laserfiche WebLink
U.S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />Permittee/ Permit Field Visit State Program <br />Person BTU EMPIRE CORPORATION Number C- 044 -81 Date 11/19/2013 <br />Continuation Page <br />I 28. Performance Standard Categories <br />Codes:l= Compliance, 2= Noncompliance, 3 =Not Planned, 4--Not Started, 5= Noncompliance Identified Elsewhere, 6= Previously Cited, 7= Permit Defect <br />A. Administrative <br />D. Backfilling & Grading <br />H. <br />Subsidence Control Plan <br />1. <br />1. <br />Mining within Valid Permit <br />1. <br />1 Exposed Openings <br />1. Roads <br />773.11 <br />2. <br />Terris & Conditions of Permit <br />Mining within Bonded Area <br />2. <br />1 Contemporaneous Reclamation <br />l . 1 <br />Road Construction <br />3. <br />1 <br />Terms & Conditions of Permit <br />3. <br />1 Approximate Original Contour <br />2. 1 <br />Certification <br />4. <br />1 <br />Liability Insurance <br />4. <br />1 Highwall Elimination <br />3. 1 <br />Drainage <br />5. <br />1 <br />Ownership and Control <br />5. <br />Steep Slopes (includes downslope) <br />4. 1 <br />Surfacing and Maintenance <br />6. <br />1 <br />Temporary Cessation <br />6. <br />Handling of Acid and Toxic Materials <br />5. <br />Reclamation <br />7. <br />Effluent Limits <br />AML Rec. Fees - Non - Respondent <br />7. <br />1 Stabilization (rills and gullies) <br />J. Signs & Markers <br />8. <br />Surface WaterDfonitoring <br />AML Rec. Fees - Failure to Pay <br />E. Excess Spoil Disposal <br />1. 1 <br />Signs <br />B. Hydrologic <br />Balance <br />1. <br />Placement <br />2. 1 <br />Markers <br />1. <br />1 <br />Drainage Control <br />2. <br />Drainage Control <br />22(a) <br />2 <br />2. <br />1 <br />Inspections & Certifications <br />p <br />3. <br />Surface Stabilization <br />K. <br />Distance Prohibitions <br />3. <br />1 <br />Siltation Structures <br />4. <br />Inspections & Certifications <br />L. Revegetation <br />816 S 17.13,14,15, & 823.11 & 21 <br />4. <br />1 <br />Discharge Structures <br />3. <br />Approximate Original Contour <br />102(axl) <br />4. <br />5. <br />1 <br />Diversions <br />F. Coal Mine Waste <br />1. <br />Vegetative Cover <br />g <br />6. <br />1 <br />Effluent Limits <br />(Refuse Piles/Impoundments) <br />2. <br />Timing <br />7. <br />1 <br />Ground Water Monitoring <br />1. <br />1 Drainage Control <br />M. <br />Postmining Land Use <br />8. <br />1 <br />Surface Water Monitoring <br />2. <br />1 Surface Stabilization <br />9. <br />Drainage - Acid -Toxic Materials <br />3. <br />1 Placement <br />N. Other <br />10. <br />1 <br />Impoundments <br />4. <br />1 Inspections & Certifications <br />General <br />11. <br />Stream Buffer Zones <br />5. <br />Impounding Structures <br />Performance <br />Category <br />C. Topsoil &Subsoil <br />G. Use of Explosives <br />I . <br />1 <br />Removal <br />1. <br />Blaster Certification <br />2. <br />Substitute Materials <br />2• <br />Distance Prohibitions <br />3. <br />1 <br />Storage and Protection <br />3. <br />Blast Survey /Schedule <br />4. <br />1 <br />Redistribution <br />4. <br />Warnings & Records <br />5. <br />Control of Adverse Effects <br />E. <br />Performance Standard Categories <br />(3161817.71 -74) <br />30 CFR Counterparts <br />A. Administratn-e ................................................ ............................... <br />1. <br />V2hdPemtit -- <br />773.11 <br />2. <br />Dfinirtg within Bonded Area <br />773.11 <br />3. <br />Terris & Conditions of Permit <br />773.17 <br />4. <br />Liability Insurance <br />800.60 <br />5. <br />Owmership and Control <br />778.13 <br />6. <br />Tempo. - Cessation <br />842.11(e) &816.817.131 <br />3. <br />Rec. Fees - Non - Respondent <br />870.15(b) <br />S. <br />ANIL Rec. Fees - Failure to Pay <br />870.15(2) <br />B. Hydrologic Balance <br />(816/817.41 -57) <br />1. <br />Drainage Control <br />- 45 <br />2. <br />Inspections &, Certifications <br />49(x)(10) <br />3. <br />Siltation Stnrunes <br />46 <br />4. <br />Discharge Structures <br />47 <br />5. <br />Diversions <br />43 <br />6. <br />Effluent Limits <br />- 42 <br />7. <br />Ground Water Monitoring <br />- -- 41(c) <br />S. <br />Surface WaterDfonitoring <br />41(e) <br />9. <br />Drainage -Acid - Toxic Materials <br />41(f) <br />10. <br />Impoundments <br />49 <br />11. <br />Stream Buffer Zones <br />57 <br />C. <br />Topsoil & Subsoil <br />(816817.22) <br />1. <br />Removal <br />22(a) <br />2 <br />Substrate Materials. <br />22(e <br />3. <br />Storage and Protection <br />22(c� <br />4. <br />Redistribution- <br />22(d) <br />P.Backfdling <br />& Grading <br />81681795 -107) <br />1. <br />Exposed Op enings - <br />816 S 17.13,14,15, & 823.11 & 21 <br />2. <br />Conterriporanecus Reclamation <br />100 <br />3. <br />Approximate Original Contour <br />102(axl) <br />4. <br />Highnall Elimination <br />102(a)(2) <br />5. <br />Steep Slopes (includes downdope) <br />107 <br />6. <br />Handling of Acid & Toxic Materials <br />102(c) <br />E. <br />Excess Spoil Disposal <br />(3161817.71 -74) <br />1. <br />Placement. ------- --- - ----- <br />71(e) <br />2. <br />Drainage Control --- --- ----- -- - - - -- <br />71(f) <br />3. <br />Surface Stabilization. <br />71(g) <br />4. <br />Inspections & CertiScaticrts <br />71(h) <br />F. <br />CO21 Mine Waste (Refuse PilesRimpoundments) - 316817.81 -84) <br />1. <br />Drainage Control <br />.83(a) <br />2. <br />Surface Stabih=i(lln <br />93(b) <br />3. <br />Placement <br />83(c) <br />4. <br />Inspections and Certifications <br />°3(d) <br />5. <br />Impounding Structures <br />84 <br />G. <br />Use of Explosives <br />4816817.61 -68) <br />1. <br />Blaster Certification <br />61(c) <br />2. <br />Distance Prohibitions <br />'1(d) <br />3. <br />Blast Survev Schedule <br />62-64 <br />4. <br />Wr'amings & Records <br />66&69 <br />5. <br />Control of Adverse Effects <br />67 <br />H <br />Subsidence Control Plan <br />(817.121 -122) <br />I. <br />Roads <br />(816817.150 -151) <br />1. <br />Road Construction <br />150(c) <br />2. <br />Certification <br />151(x) <br />3. <br />Drainage <br />150(b )151(d) <br />4- <br />Surfacing and Mairte3ance <br />150(e )-151(d) <br />5. <br />Reclamation <br />150(1) <br />J. <br />Signs & Markers <br />816817.11) <br />1. <br />Signs <br />I I (a),(b),&(c) <br />2. <br />Markers <br />11(a),(bJ(d),(eX&(f) <br />K <br />Distance Prohibitions <br />(761.11) <br />L. <br />Revegetation <br />(816817.111 -116) <br />1. <br />Vegetative Cover <br />111 & 116 <br />2. <br />T-9 <br />113 <br />\I. <br />Postmining Land Use <br />(816817.133) <br />OSM Action Off -Site Impacts <br />t) Deferred to State Action 8) ID-CO Issued (Imminent Danger to Public) For each type of impact and resource affected, enter <br />2) TON Issued 7) Previously tiled by RA, abatement pending "N, D, or J" to describe the degree of off -site impact: Page 2 of 2 <br />3) NOV Issued 8) Abated during or before OSM inspection N - Minor Occurrence <br />4) FTA -CO Issued 9) Follow -up of Federal Action D - Moderate Occurrence Re d O�ber t, 2010 <br />5) IH-CO Issued 0) Off -she impact with no violation J - Major Occurrence <br />