Loadout <br />The disturbed area at the loadout has been granted full and final bond release. All of the <br />structures at the loadout were removed from the site during 1986 and 1987. Some of the <br />foundations were buried on site. During 1987 the loadout site was contoured and seeded. <br />Based on a vegetation survey performed during November 1991, a demonstration was <br />made that untreated drainage from the reclaimed loadout has a ground cover of living <br />plants adequate to control erosion. Therefore, sedimentation control was no longer <br />required at the loadout. See the discussion beginning on page 4 -99(b) for more details. <br />Wells & Explorations Holes <br />The following table presents the status of the drill holes known to exist at the mine site. <br />Drill holes at the unit train loadout have been excluded from this table since that area has <br />been released from the permit. <br />[Ho—le No. <br />Location <br />Status <br />M -1 <br />No. 1 Mine North of Road <br />Reclaimed 1987 <br />M -2 <br />No. 3 Mine <br />Reclaimed 1980 <br />M -3 & M -4 <br />No. 3 Mine <br />Reclaimed 1987 <br />M -7 <br />Above Refuse Pile <br />Reclaimed 1994 <br />M -8 <br />No. 1 Mine (Map D -2 -23) <br />Permanent <br />M -9 <br />No. 3 Mine (Map D -2 -23) <br />Permanent <br />PZ -1 through PZ -3 <br />Inside No. 3 Mine <br />Unknown <br />D -1 A & D -2A <br />Refuse Pond Dam <br />Sealed - Monitoring Wells <br />Drill hole M -2 was cemented immediately after drilling. See appendix 3 -D for details. <br />According to the scope of work for the mine site reclamation performed in 1987, holes M -1, <br />M -3 and M -4 were filled with lean cement. <br />Permit Renewal 4 -vii (Rev. 03/13) <br />