My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-05_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2013-12-05_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:50 PM
Creation date
12/6/2013 10:56:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/5/2013
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Tri-State Generation and Transmission Association, Inc
Type & Sequence
TR5
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Chris Gilbreath <br />December 5, 2013 <br />Page 2 <br />compliance for any coal operation which, in the judgment of the Division, has the <br />potential to negatively impact the quality of groundwater for which quality standards <br />have been established by the Water Quality Control Commission. Specific points of <br />compliance are established after consultation with the Division of Water Resources to <br />determine the effects of surface mining activities on the quantity and quality of water in <br />groundwater systems in the permit area and adjacent areas. Analytical data for the new <br />nested set of wells were just recently submitted with TR -05 and the Division has not had <br />the opportunity to fully review these data along with other geohydrological information <br />to determine the potential for negative impacts to groundwater within and adjacent to the <br />NHN permit area. Since this analysis has not been fully completed in accordance with <br />4.05.13 it is premature to select points of compliance. Please remove all reference in the <br />revised permit text submitted with TR -05 that refers to (GW -N56, GWN -57, and GW- <br />N58) as the points of compliance for the NHN Mine. It would be appropriate to revert <br />back to the original permit text prior to TR -05 regarding the points of compliance <br />discussions. <br />Please feel free to call me if you have any questions. Thank you for your cooperation. <br />Sincerely, <br />/$It d P, 69U&Y <br />Michael P. Boulay <br />Environmental Protection Specialist <br />C: Denver File <br />
The URL can be used to link to this page
Your browser does not support the video tag.