My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-12-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:46 PM
Creation date
12/5/2013 11:15:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/3/2013
Doc Name
Weeekly Construction Quality Assurance
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tt <br />i <br />TMIe <br />South MSE Wall: <br />Leveling pad concrete form work construction and concrete pouring for the leveling pad occurred. Work to continue. <br />A Cat 302 mini excavator was observed removing tailings from behind the Crib Wall to expose the timbers for use on the South <br />MSE Wall facade. <br />u) Storm Water Management <br />Best Management Practices (BMP) is being performed. <br />period following any precipitation. <br />CQA ACTIVITIES: <br />Erosion control efforts took place during this reporting <br />Y) Field Activities: Observation of construction activities during this reporting period included: Tree removal, Production <br />drilling and blasting, VLF /PSSA Cut to Fill and compaction, Class -6 material placement along the shoulders of the HWY <br />67 alignment and leveling pad construction at the South MSE Wall, Underground remediation, clay (SLF) processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 68 and 69 -S were obtained during this reporting period. Note that samples with the suffix " -S" <br />indicate the material originated from the Squaw Gulch Borrow Site; sample numbers lacking the suffix are from the <br />Cameron Site. <br />DCF: Sample Numbers 35 thru 38 were obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on November 13'" between CC &V, Ames, and <br />Amec. <br />Summary of Concerns: None <br />CCTV: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: Drilling commenced for the closure drain late Friday night / Saturday morning (Nov 15/16). <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />`— — <br />Reviewed B`p�- -�_ - -- <br />'Fim Burlchard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By: <br />Date: 16 Nov 20 <br />Date: ' z, -13 <br />Date:% -2.9 —/_j <br />Page 3 of 6 <br />MLE2 WE 11.16.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.