i <br />i <br />amet <br />A Cat D8T and a Cat D6 dozer worked on constructing the south perimeter road near stations P2 +00 to P12 +00 and <br />cutting the neighboring slopes to grade. A Cat CS56 smooth drum roller compacted the slope and road surfaces <br />per method spec. <br />Fill material was generated from slope grading near Bench DD north of the Crib Wall for the ADR Road fill and the <br />Buttress fill area. Fill materials used at the PSSA toe berm mostly originated from cut removed near Bench A <br />(approximate stations A14-�00 to A16 +00). Fill material from above Bench A near station A4 +00 was placed near <br />station A5 +00 to A8 +00. <br />Clay (SLF) Processing: <br />Cameron Site: Clay processing ended at the Cameron site on Wednesday, November 13, 2013. The clay <br />processing equipment was moved to the Squaw Gulch Clay Borrow area. Approximately, 244,860 tons of clay / soil <br />liner fill (SLF) material was produced at the Cameron site. SLF produced from the operation remains stockpiled at <br />Cameron Site for later removal / use. <br />Squaw Gulch Clay Borrow Site: Clay processing equipment was setup at the Squaw Gulch Clay Borrow Site <br />and clay processing began on Saturday November 16, 2013. Approximately, 160 tons of soil liner fill material was <br />produced during this reporting period at the Squaw Gulch Clay Borrow Site. <br />Underdrain System: <br />Secondary Underdrain: Approximately, 300 feet of secondary underdrain was installed in the VLF near / above <br />station A6 +00. <br />Approximately a total of 3,854 feet of Secondary Underdrain has been completed. Note that this figure has been <br />reconciled from the previous week's report based on survey data. <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. <br />A total of 1,294.60 feet of Primary underdrain has been completed. <br />Tree /Slash Clearing Chipping: <br />Trees were removed along Phase 2 Diversion Channel alignment and were stockpiled in the area for later removal. <br />R) Underground Workings <br />Confirmatory drilling was performed during this reporting period on underground working No. 6087, 6282, and 6283. <br />All drill hole locations were established on a 4 -foot center isolating any voids found. Further remediation efforts will <br />be ongoing until remediated. Summary of the remediation efforts will follow when remediation is completed. <br />Remediation blasting occurred at UG 6003. Remediation to continue. <br />Underground workings No. U6280 and 6036 were prepared for concrete plug placement <br />28 unknown workings (UG #s U6361 through U6387) were located downslope from the Phase 2 Diversion Channel <br />and Access Road and 3 unknown workings were located near the south perimeter road (UG No. U6340, U6388 and <br />U6389). Remediation is pending. <br />Underground working No. U6335 was excavated to competent bedrock, then backfilled and compacted. The <br />working is considered remediated. <br />Q Highway 67 <br />Class 6 material was placed at the edge of the pavement along the shoulders of the Realignment. <br />Page 2 of 6 MLE2 WE 11.16.13. doe <br />