My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2013-11-27_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:35 PM
Creation date
12/2/2013 7:53:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/27/2013
Doc Name
Initial Adequacy Review Letter
From
DRMS
To
Greg Smith
Type & Sequence
TR68
Email Name
SB1
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9of10 <br />b. The temporary truck chute is not depicted on the revised version of Map 11 Sheet 3. <br />Mine water lines have been added to the revised version of Map 11 Sheet 2 <br />The new road has been added to the revised version of Map 13, but not to the revised <br />version of Map 11 Sheet 1 <br />d. The revised version of Map 13 does not depict the Bates Portal fan. It should agree <br />with Map 11 Sheet 3. <br />e. As noted in the inspection report of October 1, 2013, the revised version of Map 13 <br />depicts the on- the - ground water management structures around the Bates Portals fairly <br />well. Ditch D24C 1 does not really exist and is not necessary — it should be removed <br />from the map. Supporting designs should be submitted for the new structures, and <br />tables 20 and 21 updated accordingly <br />f The downstream section of C2 is still shown on the revised version of Map 13; the only <br />section remaining on the ground is the section under the road <br />g. D6 has been extended on the revised version of Map 13 <br />h. The outlet of C 17 has not been changed. The location relative to the thickener tank <br />should be verified and the culvert updated if necessary <br />i. The re- design of the C16 system of culverts is pending. Ditch D16 was re- routed <br />around the power pole <br />J. Has the function of C12 been evaluated? <br />k. The location of the Raw Coal Reclaim Sump Discharge has not been updated, please <br />verify and update Map 13 as necessary <br />The contours around the explosives area on the revised version of Map 13 do not show <br />the berm <br />m. The boot wash building has not been shown at drop inlet 1 on the revised version of <br />Map 13 <br />n. The response is sufficient <br />o. NECC chose to submit Map 11 as 3 sheets (Roads etc., Utilities, Facilities). The <br />Division has no objection to this. <br />23. Map 14 — West Portal Sediment and Surface Water Control <br />a. The revised version of Map 14 more accurately depicts the actual structures on the <br />ground, particularly in the area where DWDA3 was proposed to be built <br />b. The SAE has been shown however it is drawn with a clean-water ditch crossing it. <br />Since an SAE is by definition an exemption for a small area of the need to treat <br />disturbed area run -off, it cannot be bisected by any ditch. The clean water diversion <br />must skirt the SAE to the east side and the map should reflect this <br />
The URL can be used to link to this page
Your browser does not support the video tag.