Laserfiche WebLink
NECC must regrade the RDA diversion ditch to ensure that there is positive flow from the <br />high point of the ditch (Station 25 +00) to the lowest elevation at the terminus of the ditch <br />(Station 0 +00). <br />Should you or the operator have any questions or need additional information, please let me <br />know. <br />