Laserfiche WebLink
Page 2 of 7 <br />BULLDOZER WORK <br />Task description: Re- topsoil 6 GVBs, 1 Exploration hole, 2 Monitoring Well pad <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 143 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 344 State: Colorado <br />Date: 11/5/2013 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C083 -344 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />packed <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />packed <br />Initial Volume: <br />10,261 <br />Swell factor: <br />1.125 <br />Loose volume: <br />11,543 LCY <br />Source of estimated volume: DRMS - 0.75' over 8.48 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1.243.2 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight <br />20% <br />7,725 feet <br />2,550 Ibs /LCY <br />Weight description: Earth - Dry <br />packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />