My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-15_PERMIT FILE - C1982057A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2013-10-15_PERMIT FILE - C1982057A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:48 PM
Creation date
11/13/2013 2:35:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
10/15/2013
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 27 of 121 <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 8000 feet <br />Net Correction: L 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered maintained 3.0 <br />Haul Route- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />0.980 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB <br />Net Correction: L 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered maintained 3.0 <br />Haul Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />3000.00 <br />2.00 <br />3.00 <br />5.00 <br />1867 <br />1 1.72 <br />Haul Time: 1.72 minutes <br />Return Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />3000.00 <br />-2.00 <br />3.00 <br />1.00 <br />2963 <br />1 1.13 <br />CIRCES Cost Estimating Software <br />Return Time: <br />1.13 <br />minutes <br />Total Scraper team cycle time: <br />4.45 <br />minutes <br />Adjusted for job conditions: <br />635.78 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />635.78 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,271.57 <br />LCY/Hour <br />Unadjusted unit production/hour: <br />782.02 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Total job time: <br />31.41 <br />Hours <br />Unit cost: $1.280 /LCY <br />Total job cost: <br />$51,140.52 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.