My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-15_PERMIT FILE - C1982057A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2013-10-15_PERMIT FILE - C1982057A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:48 PM
Creation date
11/13/2013 2:35:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
10/15/2013
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 26 of 121 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile I to Road A <br />Site: Seneca II -W Mine Permit Action: MT6 Permit/Job #: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 051 State: Colorado <br />Date: 6/20/2013 County: . Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: C057 -051 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />tact Rrnakdawn- CCrnnPr Wnrlr Ta m Q.—+ r7_.____+ a f- :_, -- -_-- n_..:_ <br />Total work team cost/hour: $1,628.20 <br />MATERIAL OUANTITIES <br />Initial volume: 39,939 CCY Swell factor: 1.000 <br />Loose volume: 39,939 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />- <br />Load Area <br />Dump Area <br />- -- ---- --- -- --- -- <br />Motor Grader <br />— ° ....... <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />$37.98 <br />$52.97 <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />$16.94 <br />$29.77 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />$27.55 <br />$0.00 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$82.46 <br />$82.74 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,463.00 <br />Support: <br />$0.00 <br />Maint: <br />$165.20 <br />Total work team cost/hour: $1,628.20 <br />MATERIAL OUANTITIES <br />Initial volume: 39,939 CCY Swell factor: 1.000 <br />Loose volume: 39,939 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 Ibs/LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.