Liberty Mining, LLC <br />DRMS 110 -d Permit Application <br />October 2013 <br />Operational Site Analysis <br />The analysis of the operational site began with delineating the offsite basins contributing <br />drainage flow toward the site and the basins within the site. The offsite flows will be intercepted <br />by two detention ponds located on the west side of the operations site at the foot of the hillside <br />above the site. The objective will be to prevent off site flows from coming onto the site. <br />Drainage flows generated on site will be directed to retention ponds located on the site. See <br />Exhibit U2 — Site Grading, for basin delineation. <br />As with the roadway analysis, the site drainage basins were determined, the areas contributing <br />to each basin were delineated, and the parameters of each identified basin were then <br />determined. The parameters determined included the area of the basin, the flow length of each <br />basin, and the average slope of the basin from the top to the bottom. These parameters were in <br />addition to the described parameters of soil types, rainfall data, vegetation cover, etc. See <br />Exhibit U2- Drainage Basin Delineation, for basin configurations. <br />Using the Rational Method of analysis for determine runoff rates, a peak runoff, based on the <br />100 year, 24 hour rainfall event, was calculated. The analytical parameters and the results of <br />the calculations are presented in Table U(10 -3) -Peak Runoff Resulting from 100- Year /24 -Hour <br />Rainfall Event. <br />Table U (10 -3) <br />Peak Runoff Resulting from <br />100- Year /24 -Hour Rainfall Event <br />For Operational Site <br />Drainage <br />Basin No. <br />Basin Area, <br />Acres <br />Length of Flow <br />Path, Feet <br />Average Slope of <br />Basin, % <br />Time of <br />Concentration, Min <br />100- Year /24 -Hour <br />Runoff Q, CFS <br />1 <br />0.234 <br />100 <br />9.00 <br />9.40 <br />0.20 <br />2 <br />0.276 <br />240 <br />3.30 <br />11.30 <br />0.30 <br />3 <br />0.320 <br />240 <br />6.24 <br />11.30 <br />0.30 <br />4 <br />0.190 <br />150 <br />13.33 <br />8.00 <br />0.20 <br />(Note - Because Drainage Basin #4 is the portals to the mine and all flows from the basin flow <br />toward the mine entrance, it was assumed that the drainage water would be pumped to the <br />closest pond, Pond #3 for disposal. Basin #4 flows are therefore added to the Basin #2 flows to <br />become the total flows into Pond #3.) <br />Sizing the detention and /or retention ponds to contain the drainage water from the operations <br />site and the intercepted offsite drainage water employed the use of the Simplified Peak Flow <br />Method of analysis to determine the volume of runoff generated by the design stone, i.e. the <br />100- year /24 -hour event. The analytical parameters and the results of the calculations are <br />presented in Table U (10-4) -Peak Runoff Volume Resulting from 100- Year /24 -Hour Rainfall <br />Event, <br />Liberty Mining, LLC Moab, Utah SMA Ref. 5821697 Page 63 <br />