Laserfiche WebLink
PERMIT #: M- 2005 -080 <br />INSPECTOR'S INITIALS: MAC <br />INSPECTION DATE: October 23, 2013 <br />PHOTOGRAPHS <br />1. Pit floor in Phase 1, facing east. <br />to <br />�.c <br />.e <br />3. Trench with exposed groundwater. <br />2. Reclaimed pit wall - southern wall of <br />Phase 1 and 2, facing east. <br />4. Wash pond. <br />5. Concrete batch plant building. <br />6. Conveyor to concrete batch plant. <br />Page 4 of 5 <br />