Laserfiche WebLink
PERMIT #: M- 2005 -080 <br />INSPECTOR'S INITIALS: MAC <br />INSPECTION DATE: October 23, 2013 <br />Topsoil: <br />Topsoil has been salvaged and stockpiled along the perimeter of the mine phases. The topsoil stockpiles are <br />vegetated and did not show any signs of erosion. <br />Financial Warranty: <br />The Division currently holds a financial warranty in the amount of $48,945.00. The financial warranty amount <br />is based on a maximum allowed disturbance of 15.8 acres and includes a cost for demolition of the concrete <br />batch plant facility. The Division and the Operator discussed the potential for allowing the batch plant building <br />to remain following the reclamation of the Allen Pit. In order to have the batch plant building remain, the <br />Operator would need to file a Technical Revision to the Reclamation Plan. The submittal would need to include <br />documentation from Park County which demonstrates that the building could remain following reclamation <br />and would be in accordance with all local zoning ordinances. Approval of above described Technical Revision <br />would result in a financial warranty decrease. <br />The Division recalculated the financial warranty estimate and determined that the existing financial warranty <br />amount of $48,945.00 remains adequate to complete reclamation at the site. <br />This concluded the inspection. <br />Page 3 of 5 <br />