Laserfiche WebLink
i <br />IIl Storm Water Management <br />f <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />l) Field Activities: Observation of construction activities during this reporting period included: <br />topsoil haul, production drilling and blasting, Cut to Fill ADR Haul Road (HR), HWY 67 construction, Underground <br />remedlation, clay (SLF) processing and Drain Cover Fill (DCF) production and processing. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample No. 55 thru 57 was obtained during this reporting period <br />DCF: Sample No, 23 thru 26 was obtained during this reporting period. <br />General Project Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on October 2,d between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne M. Clark Date: 10.05.13 <br />Thorne M Clark <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By: <br />Date: /i" <br />Page 3 of 6 NILE2 WE 10.05.13.doc <br />