My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-30_REVISION - M1977310 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977310
>
2013-10-30_REVISION - M1977310 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:45 PM
Creation date
11/5/2013 5:47:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977310
IBM Index Class Name
REVISION
Doc Date
10/30/2013
Doc Name
DRAINAGE DESIGN PLAN FOR THE JD6 MINE
From
COTTER
To
DRMS
Type & Sequence
AM1
Email Name
TC1
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD -6 Mine - Drainage Design Plan <br />Figure 11. <br />Photograph of Stormwater and Sediment Retention Pond ............................. .............................25 <br />Figure 12. <br />Site Map Showing Planned Stormwater Retention Pond in the Mine Facilities Area .................27 <br />Figure 13. <br />Stage- Storage Curve for Planned SWRP ........................................................ .............................28 <br />Figure 14. <br />Schematic of Stormwater Routing at the JD -6 Mine ...................................... .............................30 <br />Figure 15. <br />Schematic of Stormwater Routing to the Planned SWRP .............................. .............................31 <br />Figure 16. <br />Hydrograph for the Upper Diversion Structure .............................................. .............................32 <br />Figure 17. <br />Hydrograph for the Middle Diversion Structure ............................................ .............................32 <br />Figure 18. <br />Hydrographs for the Lower Diversion Structure East and North ................... .............................33 <br />Figure 19. <br />Hydrographs for Planned Stormwater Retention Pond .................................. .............................41 <br />Figure 20. <br />Depth of Water above Spillway Crest ............................................................ .............................42 <br />LIST OF PLATES <br />Plate 1. JD -6 Mine Drainage Basins, Lease Boundary, Vent Holes, and Mine Facilities <br />Plate 2. Existing Channel Profiles for the Upper Diversion Structure <br />Plate 3. Planned Channel Reconstruction for the Upper Diversion Structure <br />Plate 4. Channel Profiles for the Middle Diversion Structure <br />Plate 5. Channel Profiles for the Lower Diversion Structure North and Lower Diversion Structure East <br />Plate 6. Engineering Drawing for the Planned Stormwater Retention Pond and Spillway <br />LIST OF ATTACHMENTS <br />Attachment 1. Rip Rap Granular Bedding Specifications (from UDFCD 2011) <br />Attachment 2. Culvert Hydraulic Profiles <br />Attachment 3. Channel Profiles — Surveyed May 28, 2013 <br />Attachment 4. WinTR -55 and HydroCAD Output Files <br />Attachment 5. Channel Stability Analysis - WinXSPro Output Files for Current Condition <br />4148A.131028 Whetstone Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.