My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-30_REVISION - M1977310 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977310
>
2013-10-30_REVISION - M1977310 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:45 PM
Creation date
11/5/2013 5:47:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977310
IBM Index Class Name
REVISION
Doc Date
10/30/2013
Doc Name
DRAINAGE DESIGN PLAN FOR THE JD6 MINE
From
COTTER
To
DRMS
Type & Sequence
AM1
Email Name
TC1
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD -6 Mine - Drainage Design Plan <br />6.1 Summary of Existing Structural Controls for Stormwater ...................... .............................43 <br />6.2 Sediment and Erosion Prevention ........................................................... .............................43 <br />6.3 Post - Mining Stormwater Controls .......................................................... .............................44 <br />7. REFERENCES ........................................................................................................... .............................45 <br />LIST OF TABLES <br />Table 1. Major Sub -Basin Areas at the JD -6 Mine ........................................................... ..............................1 <br />Table 2. Design Storm Parameters .................................................................................... ..............................2 <br />Table 3. Manning's "n" Values Used in Cowan's Method for Channel Roughness ........ ..............................6 <br />Table 4. Soils Types in Vicinity of the JD -6 Mine Facilities (Sub -Basin 132) ................. .............................10 <br />Photograph of Waste Rock Piles and Mine Facilities Area .............................. .............................16 <br />Table 5. Runoff Curve Numbers for Arid and Semi -Arid Rangelands .......................... ............................... <br />l l <br />Table 6. Runoff Curve Numbers for JD -6 Mine ............................................................ ............................... <br />l 1 <br />Table 7. Sub - Basins Contributing to Upper, Middle, and Lower Diversion Structures .. .............................12 <br />Typical Channel Profiles Measured in Upper Diversion Structure ( UDS) ....... .............................19 <br />Table 8. Sub -Basin Intercepted by EE 19 Road ................................................................ .............................12 <br />Figure 6. <br />Table 9. Sub -Basins Contributing Run -On to Mine Facilities Area ................................ .............................14 <br />Table 10. Reach Geometry and Hydraulic Parameters .................................................... .............................18 <br />Typical Channel Profiles Measured in Middle Diversion Structure ................. .............................21 <br />Table 11. Upper Diversion Structure Channel Geometry ................................................ .............................18 <br />Figure 8. <br />Table 12. Middle Diversion Structure Channel Geometry .............................................. .............................21 <br />Table 13. Lower Diversion Structure Channel Geometry ............................................... .............................22 <br />Photograph of Lower Diversion Structure North (LDS -N) .............................. .............................23 <br />Table 14. Structure Parameters ...................................................................................... ............................... <br />25 <br />Table 15. Stage- Storage Data for the Planned Stormwater Retention Pond .................... .............................26 <br />Table 16. Sub -Basin Areas, Receiving Reach, Weighted Average Curve Number, and Time of <br />Concentrationin TR -55 Model ....................................................................... .............................30 <br />Table 17. Peak Flow (cfs) and Peak Time (hr) by Rainfall Return Period ...................... .............................34 <br />Table 18. Conveyance Capacity for Diversion Structures ............................................... .............................35 <br />Table 19. Channel Stage to Convey 100 -year Peak Flow ................................................ .............................36 <br />Table 20. Channel Stage, Velocity, and Shear Stress for 100 -year Peak Flow for the MDS, LDS -E, and <br />LDS -N ............................................................................................................ .............................36 <br />Table 21. Stage, Velocity, and Shear Stress for 100 -year Peak Flow for the Existing and Planned UDS ...38 <br />Table 22. Required S WRP Capacity to Contain the 10 -year 24 -hour Storm ................... .............................39 <br />Table 23. Calculated Runoff Reporting to the S WRP from the 100 -year 24 -hour Storm ............................40 <br />Table 24. Planned Retention Pond Spillway Analysis ..................................................... .............................42 <br />Table 25. Culvert Capacity for 100 -year 24 -hour Storm Event ....................................... .............................43 <br />LIST OF FIGURES <br />Figure 1. Site Map Showing Sub -Basins Contributing to Upper, Middle, and Lower Diversion Structures 13 <br />Figure 2. <br />Site Map Showing Sub - Basins Contributing to Mine Facilities Area .............. .............................15 <br />Figure 3. <br />Photograph of Waste Rock Piles and Mine Facilities Area .............................. .............................16 <br />Figure 4. <br />Detailed Site Map Showing Stormwater Flow Directions in the Mine Facilities Area .................17 <br />Figure 5. <br />Typical Channel Profiles Measured in Upper Diversion Structure ( UDS) ....... .............................19 <br />Figure 6. <br />Photographs of Upper Diversion Structure ....................................................... .............................20 <br />Figure 7. <br />Typical Channel Profiles Measured in Middle Diversion Structure ................. .............................21 <br />Figure 8. <br />Photograph of Lower Diversion Structure East ( LDS- E) ................................. .............................23 <br />Figure 9. <br />Photograph of Lower Diversion Structure North (LDS -N) .............................. .............................23 <br />Figure 10. <br />Photograph of Lower Diversion Structure North (LDS -N) ............................ .............................24 <br />4148A.131028 Whetstone Associates • <br />
The URL can be used to link to this page
Your browser does not support the video tag.