Laserfiche WebLink
8 <br />�i <br />s <br />N <br />0 <br />Z <br />S <br />I•. <br />\ \ o <br />20' OFF <br />II <br />It <br />(I <br />I I ono <br />I I <br />I I COUNTY <br />ROAD 13 <br />I) <br />I� <br />I ,�o <br />II <br />\1 <br />o <br />�I <br />11 <br />it <br />11 <br />II <br />11 <br />11 <br />11 <br />11 <br />11 <br />it <br />11 <br />11 <br />CO <br />°� tt <br />�I <br />Y <br />r` <br />a 1 <br />NORTH y z <br />200 0 200 400 600 <br />( IN FEET) a <br />1 inch = 200 ft. �3 <br />LEGEND: <br />PERMIT BOUNDARY z <br />EXISTING ROAD <br />EXISTING 10 FOOT CONTOUR <br />EXISTING 50 FOOT CONTOUR — — — —8050— — LL <br />PROPOSED 1 FOOT CONTOUR 8071 z <br />PROPOSED 5 FOOT CONTOUR —8070— O <br />m <br />= d <br />X <br />W d <br />J <br />NOTES: U <br />W <br />1. Reclamation to rangeland will occur concurrently with mining <br />activities. <br />,yo <br />2. Native, clean fill material composed of topsoil, waste rock, and <br />overburden will be used to create final reclamation slopes. <br />3. As topsoil and waste rock /overburden are removed from active <br />mining areas, it will be used to create reclaimed slopes and to <br />Z <br />cover the pit floor in previously mined out areas. <br />_0 <br />4. Final reclaimed slopes shall be 3H:1 V or flatter. <br />F— <br />U <br />F ,, <br />U <br />5. Topsoil and waste rock /overburden not immediately used for <br />J <br />ll3 <br />0 <br />v <br />9 <br />reclamation will be stockpiled on the pit floor. <br />a <br />0 <br />Q <br />o <br />� <br />� <br />U <br />r <br />z <br />.J <br />d <br />MINING SLOPE <br />z <br />(n <br />z_ ! //— HISTORIC GROUND <br />J <br />r <br />W <br />- -- - -`----- ----- <br />c <br />z <br />Q <br />------ - <br />Q <br />3' <br />i TOP SOIL <br />W <br />U) <br />o! <br />Q <br />o! <br />a ? MINING FLOOR <br />g 2 <br />0 <br />0 <br />N N <br />M1 <br />MINING SECTION <br />r' <br />C <br />W Q <br />U <br />N.T.S. <br />W <br />Q <br />�o <br />