Laserfiche WebLink
ti <br />Z <br />S <br />y <br />N� <br />7 <br />\ Co It <br />Co <br />%� 9 1 <br />\ \ NORTH � Z <br />o <br />\ \\ - - - - -- ice/ .00 w <br />\ \ �- � - — - - - - - - 200 0 200 400 600 - ° <br />IN FEET 0 <br />\ \ C, // / °�° 1 inch = 200 ft. �3: <br />\ \ Co // Q <br />\� \ 20' SETBACK COUNTY LEGEND: <br />\ \ / ROAD 13.3 <br />\ \ Z <br />SITE ACCESS <br />\ \ / PERMIT BOUNDARY Q <br />J <br />\ \ LIMITS OF LIMITS OF MINING - - - - - - - <br />\ \ MINING � <br />EXISTING ROAD = _ _ _ _ _ _ ( <br />EXISTING 10 FOOT CONTOUR - - - -8010- - I n <br />Z <br />1 <br />EXISTING 50 FOOT CONTOUR -~ - - -8050- - c) z <br />MINING DIRECTION F C <br />PHASE I — G <br />{ {' APPROXIMATE 5.0 ACRES lop Co ZZ <br />{ j PROCESSING NOTES: = z <br />I I FACILITY AREA � — <br />{ � 1. Mining to proceed in a southerly direction from the northern end of the <br />proposed permit area. W <br />— <br />°�o i <br />lop line Proposed permit boundary shall be a minimum of 25 feet from center <br />line of County Road 13.3. <br />3. Adjacent to County Road 13.3, setback from proposed permit boundary 1 <br />f COUNTY to the top of mining slope shall be a minimum 20 feet. <br />ROAD 13 4. Equipment typical for aggregate mining activities such as scrapers, <br />loaders, excavators, dozers, graders, haul trucks, and water trucks will be n/ <br />�o used on site. <br />PHASING �° 5. After non – marketable waste rock / overburden materials are removed <br />LINES from the surface, mining will proceed to a depth of approximately 30 <br />PHASE II feet below the ground surface. <br />6. No groundwater is expected to be encountered during mining. <br />{ 5.0 ACRES 7. An on –site processing facility, potentially consisting of conveyors, <br />I 1 screens, washers, and crushers, will be placed in the bottom of the O <br />proposed mine pit as soon as possible. Finished aggregate products are <br />1 \ stockpiled adjacent to the processing facility. The below grade operation �.- <br />\ \ of the processing facility will help minimize visual, noise, and dust Q <br />impacts from the facility. U (� <br />\ \ 8. The temporary mine office, scale, and employee parking and general J w 0 <br />\ \ / <br />storage/parking for mobile mine equipment will be within the processing a <br />stora O O <br />\ \ 9. Best Management Practices will be used to limit the discharge of Q 0 <br />stormwater sediment onto adjacent lands and waterways. 0 <br />h y: <br />PHASE III Z <br />J :D <br />I I 5.0 ACRES z V) MINING SLOPE a Q <br />{ { Z HISTORIC W 2 <br />{ I J GROUND ` Z <br />- W Z W <br />I I 3� - - - -- Q p Q <br />SAND /GRAVEL 3, 1, � U) J <br />f <br />W <br />MINING FLOOR <br />11 tZ >- <br />II <br />Of <br />11 Lo <br />w <br />11 aZ U-) b M <br />D L_ S <br />0 0 N N <br />I 1 m II <br />I I C? MINING SECTION L0 J dj <br />1 1 • N.T.S. w U Q <br />1 1 N. �o <br />