My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-29_REVISION - M1986076 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2013-10-29_REVISION - M1986076 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:28 AM
Creation date
11/5/2013 9:46:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
REVISION
Doc Date
10/29/2013
Doc Name
FINANCIAL WARRANTY INCREASESI02
From
DRMS
To
DGMC
Type & Sequence
SI2
Email Name
KAP
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 002 <br />Total Travel Time: 0.3740 <br />Total Cycle Time: 0.8665 <br />Load Bucket Capacity <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 0.875 Blasted rock - well blasted (80 - 95 %) 0.875 <br />Adjusted Capacity: 3.41 LCY <br />Job Condition Correction Factors <br />Site Altitude: 10800 feet <br />Source <br />Altitude Adj: 0.92 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.76 multiplier <br />Unadjusted Hourly Unit Production: 236.30 <br />Adjusted Hourly Unit Production: 180.44 <br />Adjusted Hourly Fleet Production: 360.88 <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: <br />Unit cost: $0.527 /ILCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Page 2 of 2 <br />minutes <br />minutes <br />8.95 Hours <br />$1.701.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.