Laserfiche WebLink
Task description: <br />Site: Incas Mine <br />HYDRAULIC EXCAVATOR WORK <br />Grade and rip reworekd mine dump areas, first phase <br />Permit Action: 2013 Inspection Permit/Job #: M1986076 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 11/23/2012 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 319D L 8' -10" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M076 -003 <br />Horsepower: <br />125 <br />Weight (MT): <br />19.55 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Rated Capacity: 1.10 <br />Bucket Fill Factor: 0.675 <br />Adjusted Capacity: 0.74 <br />Job Condition Correction Factors <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Rock - Well blasted (60% - 75 %) 0.675 <br />LCY <br />Source <br />Altitude Adj: 0.78 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.65 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: <br />157.98 <br />102.28 <br />102.28 <br />Unit cost: $0.967 /LCY <br />Site Altitude: 10800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY /Hour <br />27.13 <br />Total job cost: $2,684.00 <br />Hours <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: $23.18 <br />NA <br />Operating Cost/Hour: $41.78 <br />100 <br />Operator Cost/Hour: $33.94 <br />NA <br />Total Unit Cost/Hour: $98.91 <br />Total Fleet Cost/Hour: $98.91 <br />MATERIAL QUANTITIES <br />Initial volume: 2,775 CCY Swell factor: <br />1.000 <br />Loose volume: 2,775 LCY <br />Source of estimated volume: Division of Reclamation, Mining <br />& Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing emit <br />Basic Job Condition Description: <br />AVERAGE <br />Secondary Job Condition within Basic Description: <br />AVERAGE <br />Cycle Time Value: <br />0.282 minutes <br />Load Bucket Capacity <br />Rated Capacity: 1.10 <br />Bucket Fill Factor: 0.675 <br />Adjusted Capacity: 0.74 <br />Job Condition Correction Factors <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Rock - Well blasted (60% - 75 %) 0.675 <br />LCY <br />Source <br />Altitude Adj: 0.78 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.65 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: <br />157.98 <br />102.28 <br />102.28 <br />Unit cost: $0.967 /LCY <br />Site Altitude: 10800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY /Hour <br />27.13 <br />Total job cost: $2,684.00 <br />Hours <br />CIRCES Cost Estimating Software <br />