Laserfiche WebLink
October 31, 2013 <br />Transit Mix Aggregates Company/ Castle Concrete/ Continental Materials Corporation <br />Pikeview Quarry <br />Inert Material Notice <br />backfill. Material will be placed using heavy equipment normally found in the mining <br />industry and standard construction practices will be followed to insure proper <br />compaction. Three French drains will be installed at the current ground surface once <br />backfilling reaches that elevation. These will intercept surface water recharge and direct <br />the flow into the stormwater drainage system. The drains will have a minimum ten -foot <br />bottom width, 2:1 sideslopes and be at least 20 feet deep. <br />Please do not hesitate to contact Mac Shafer or Jeremy Pritchett if you have any <br />questions. <br />Sincerely, <br />�e <br />Mac Shafer <br />Vice President of Aggregates <br />Transit Mix/Castle Concrete /Continental Materials <br />Attachments <br />Figure 1 — Plot Plan <br />Affidavit and Inert Material Screening Protocol <br />Certified Mail No. <br />