Laserfiche WebLink
considered to be a spoil spring site. At the Fish Creek Tipple, the springs emanating from the upslope side of <br />Pond E are measured semiannually for flow and field parameters. A full suite sample is collected for analysis at <br />that time as well. In addition to monitoring these particular spoil spring sites, the area surrounding the Fish <br />Creek Tipple is incorporated into the annual spring survey. This annual May survey was established in the <br />hydrologic monitoring program of Colorado Yampa Coal Company's Permit C -81 -071. If additional springs are <br />discovered, further monitoring requirements will be accomplished in accordance with the spoil spring <br />monitoring plan. Details regarding the sampling schedule and tested parameters for both natural and spoil <br />springs are located in Exhibit 14, Hydrologic Monitoring Plan. <br />Discharge from the underground mine will be sampled at two locations: Site 109 and Site 115. Site 109 is <br />located near the main portals and the discharge water is piped the pit south of Pond D and then enters Pond D <br />via the channel between the pit and the pond before entering Foidel Creek, or alternatively, it is piped to Site <br />114 where it is eventually used for underground dust suppression. Discharge of excess groundwater inflows <br />(temporary — during shaft excavation only) from the 6NM Shaft is sampled at Site 121. <br />Site 115 is located northwest from the main portal area. The water at this site is detained within a series of <br />impoundments before its discharge to Fish Creek. Site 109 is sampled for a full suite analysis quarterly while <br />Site 115 is sampled per the requirements of the NPDES Permit CO- 0042161. At both sites, water discharge <br />meters have been installed to monitor the quantity of mine discharge. A flume at Site 121 is used to measure <br />discharge of excess groundwater inflows. <br />Responsible for meeting the effluent limitations mandated by NPDES Permit CO- 0027154 transferred from the <br />Colorado Yampa Coal Company (CYCC) to TCC at the time of final bond release for the Eckman Park Mines. <br />TCC is directly responsible for NPDES Permit Nos. CO- 0036684 and CO- 0042161. Permit No. CO- 0036684 <br />establishes the effluent limitations for the Fish Creek Tipple. Permit No. CO- 0042161 governs flow at the Fish <br />Creek Dewatering Facility. The dewatering facility permit, issued in July of 1989, establishes effluent <br />limitations for mine discharge only; surface flow does not enter the impoundment structures. A temporary <br />Construction Dewatering Discharge Permit (Permit No. COG - 0072272) was issued for discharge of excess <br />groundwater inflows to the 6NM Shaft during shaft excavation. <br />As with ground water monitoring, necessary surface water measurements and sample analysis will utilize <br />standard EPA measurement methods and ASTM test procedures. A list of the surface water parameters, which <br />will be analyzed, is presented as Table C of the Hydrologic Monitoring Plan (Exhibit 14). Effluent limitations <br />for discharges from sedimentation control and mine discharge structures are specified in one of four NPDES <br />Permits: CO- 0027154, CO- 0036684, CO- 0042161, and COG - 0072272. The NPDES Permits are located in <br />Exhibit 30 (Volume III), Exhibit 10 (Volume VIII), and Exhibit 44 (Volume IIIA), respectively. <br />In order to directly monitor the effect of mining into the saturated overburden unit, a mine water inflow survey <br />will be conducted once per year. The survey will consist of on -site measurement of water inflow where it <br />occurs in the <br />mine, using bucket - and - stopwatch, portable weirs or flumes, and estimates of flow in areas where direct <br />measurement is not possible. The results of the survey will be plotted on a map of the mine and submitted as <br />part of the annual hydrologic monitoring reports. <br />Documentation and Reporting <br />All surface and ground water monitoring data will be permanently recorded and maintained in the TCC or <br />Colorado Yampa Coal Company files <br />The data required under the different NPDES Permits will be filed on a monthly or quarterly basis, depending <br />on the specific permit. TCC will submit a separate letter of notification to the CDMG of the NPDES filing. If a <br />discharge from a sedimentation control structure exceeds the NPDES effluent limitations, TCC will notify the <br />CDMG per the NPDES permit reporting requirements. The NPDES data will continue to be incorporated into <br />the annual hydrologic report. An Annual Hydrology Report summarizing all monitoring data for the water year <br />from October through September (a "water year ") will be submitted to the regulatory agency by February 28 of <br />the following year. <br />PR09 -08 2.05 -169 04/29/09 <br />