My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-17_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-10-17_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:34 PM
Creation date
10/30/2013 9:28:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/17/2013
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(D) Monitoring for additional water quality constituents may be required b <br />the Division based upon site - specific conditions. approved postmininQ land use. or for good cause shown. <br />HYDROLOGIC MONITORING PROGRAM <br />TCC will conduct a program of surface and ground water monitoring in the Foidel Creek Mine Permit and <br />adjacent areas. A detailed discussion of monitoring procedures and the schedule for monitoring activities is <br />presented as Exhibit 14, Hydrologic Monitoring Plan. Monitoring activities will continue on a regular basis <br />until the effects of mining- related activities have been determined to have stabilized and are within acceptable <br />limits, as determined from water quality criteria, and until approved to be reduced or terminated by the CDMG. <br />The monitoring program conforms with all applicable State and Federal laws and will provide a continuing <br />means of detecting and measuring any changes in the area hydrologic environment. Hydrologic monitoring <br />activities will address the quality and quantity of both surface and ground water systems. Hydrologic <br />monitoring sites will be accessed from dedicated lught -use roads or pre- existing County or ranch roads. <br />Ground Water Monitoring <br />Ground water monitoring in the permit and adjacent areas will involve measurement of ground water levels on <br />both a semi - annual and quarterly basis and collection of ground water physical data and the sampling and <br />analysis of ground water chemical constituents on both a semi - annual and quarterly basis. Ground water <br />monitoring activities will encompass bedrock ground water and shallow alluvial ground water. The monitoring <br />well locations are shown on the Hydrologic Monitoring Plan Map (Map 13A). <br />Semi - annual ground water sampling of bedrock wells and quarterly sampling of alluvial wells will involve <br />measurement of ground water temperature, pH, and electrical conductivity, and collection of the necessary <br />samples for chemical analysis. Standard EPA calibration and measurement methods will be used for all ground <br />water measurements in the field. Acceptable techniques will be used to ensure the collection of representative <br />ground water samples from wells. Water samples will be analyzed by a qualified laboratory using standard <br />ASTM or EPA approved test procedures. Ground water analysis will involve measurement of the selected <br />parameters and chemical constituents listed in Exhibit 14, Hydrologic Monitoring Plan. <br />A 1995 water monitoring well was drilled to replace FCM #2, which has failed. The well, 95M005, will monitor <br />the Trout Creek sandstone. After completion of the well, the site was reclaimed, the topsoil replaced, and the <br />site reseeded with the appropriate seed mixture. <br />Surface Water Monitoring <br />Surface water monitoring will address the quality and quantity of area streamflows. Collection of the necessary <br />monitoring information will involve the following activities: <br />Sampling and collection of flow and field parameters; 12 per year during the period of March through <br />September. Collection of 4 samples per year for full -suite analysis. Typically, flow measurements will extend <br />from March into September. This period corresponds with the beginning of the major runoff period and <br />continues into the low -flow period. The measurement frequency is given in Exhibit 14, Hydrologic Monitoring <br />Plan. <br />Continuous measurements of streamflow and water stage data for Foidel and Middle Creeks will be available <br />from surface water gauging stations maintained by USGS -WRD. Stream sampling activities during periods of <br />active flow will involve measurement of stream temperature, pH, specific conductance, and collection of the <br />necessary samples for chemical analysis. <br />It is anticipated that water percolating through the upgradient spoil, together with a small amount of runoff from <br />the adjacent area, will enter into the Area 2 Pit and the combined amount will be sufficient to cause overflow <br />from the pit to Pond D. In order to measure the overflow, a cutthroat flume has been installed in the channel <br />which connects the pit and Pond D. The point between the pit and Pond D has been designated as Site 7 and is <br />PR09 -08 2.05 -168 04/29/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.