Laserfiche WebLink
hi-e 2 ot'3 <br />112 Annual Report �- <br />C� <br />Pennittee Name <br />Rio Grande Silver -Inc. <br />Pertnit Number: <br />h1- 1977 -215 <br />Operation Name: <br />Bulldog Mlnit O eration <br />Count),: <br />Mineral <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />October 31, 2013 <br />Pennit Acreage: <br />568 <br />Current Bond Amt: <br />$159,250.72 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116., each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br />compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br />riles and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />YES NO <br />YES NO <br />YES NO <br />Sept. 4, 2013 <br />YES NO <br />YES NO <br />YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 60 acres <br />8. Number of acres that were newly affected during the current report year. �ip 0.81 acres <br />9. Number of acres that were reclaimed during the current report year. '101 T%\1 �O 0 acres <br />�V �Oo P.�� <br />10. Estimated new acreage to be affected in the next report year. QG� �F��O0�� 0 acres <br />11. Estimated acres to be reclaimed in the next report year. !8'd °GPa 0.0 acres <br />12. Total acres in various stages of reclamation, since permitted mining activities began. <br />Total acres <br /><1 <br />Total acres <br />2.54 <br />Total acres <br />0.44 <br />Total acres <br />0 <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />1 <br />Total acres <br />0 <br />Topsoil <br />0 <br />Mulch application <br />0 <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Hand - seeding <br />Fertilizer <br />N/A <br />Mulch <br />N/A <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />