Laserfiche WebLink
Task description: <br />Site: Stonewall #1 <br />SCRAPER TEAM WORK <br />naturals and fines — 10 inches over 5 acres <br />Permit Action: Pre -op Phase 1 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 9/25/2013 County: Las Animas <br />User: TOD <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Pagel of 2 <br />Permit /Job #: M2013053 <br />Abbreviation: None <br />Filename: M053 -002 <br />COSTShift basis: 1 per day <br />C'nct Rrnakdnwn- Rernner Work Team Sunnort Fnuinment Maintenance F.ouinment <br />Total work team cost/hour: $272.89 <br />MATERIAL OUANTITIES <br />Initial volume: 6,720 CCY Swell factor: 1.000 <br />Loose volume: 6,720 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$63.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$179.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$272.89 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $272.89 <br />MATERIAL OUANTITIES <br />Initial volume: 6,720 CCY Swell factor: 1.000 <br />Loose volume: 6,720 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />1,6001bs/LCY <br />Struck Volume: <br />15.70 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />22.00 <br />LCY <br />Rated Payload: <br />52,800 pounds <br />Average Volume: <br />18.85 <br />LCY <br />Payload Capacity: <br />33.00 LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />