My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-24_PERMIT FILE - M2013053
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013053
>
2013-10-24_PERMIT FILE - M2013053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:29 PM
Creation date
10/24/2013 4:15:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013053
IBM Index Class Name
PERMIT FILE
Doc Date
10/24/2013
Doc Name
Second Adequacy review
From
DRMS
To
John P. Arvy/ ALL-RITE PAVING
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Stonewall #1 <br />MOTOR GRADER WORK <br />Phase 1 <br />Permit Action: Pre -op Phase 1 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 10/23/2013 County: Las Animas <br />User: TOD <br />Agency or organization name: DRMS <br />Permit /Job #: M2013053 <br />Abbreviation: None <br />Filename: M053 -001 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M Horsepower: 158 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />5.00 <br />Permit <br />acres <br />Average Grader Speed: <br />3.25 <br />Utilization % <br />Ownership Cost/Hour: <br />$24.43 <br />NA <br />Operating Cost/Hour: <br />$45.38 <br />100 <br />Ripper Operating Cost/Hour: <br />$2.01 <br />100 <br />Operator Cost/Hour: <br />$27.55 <br />NA <br />Total Unit Cost/Hour: <br />$99.37 <br />feet <br />Total Fleet Cost/Hour: <br />$99.37 <br />acres/hour <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />5.00 <br />Permit <br />acres <br />Average Grader Speed: <br />3.25 <br />mph <br />Selected Application: <br />Heavy <br />blading (0 -6 mph) - 3.25 <br />Selected Blade Angle: <br />-1 <br />degrees <br />Effective Blade Length: <br />0.00 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />7.58 <br />feet <br />Unadjusted Hourly Unit Production: <br />2.9861 <br />acres/hour <br />Job Condition Correction Factors <br />Site <br />Altitude: 8050 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.80 <br />(1sh/d, adv.) <br />Net Correction: 0.8000 multiplier <br />Adjusted Hourly Unit Production: <br />2.3888 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />2.3888 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $41.60 per acre <br />Total job time: 2.09 Hours <br />Total job cost: $208.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.