Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2013 CQA Field Staff Schedule MLE2 <br />ameol- <br />Name <br />Sept 15 <br />Sept 16 <br />Sept 17 <br />Sept 18 <br />Sept 19 <br />Sept 20 <br />Sept 21 <br />Thorne Clark <br />- <br />PR <br />PR <br />PR <br />- <br />PR <br />PR <br />Steve Rice <br />- <br />- <br />UG <br />UG <br />UG <br />- <br />- <br />Ben Melly <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Kevin Duarte <br />- <br />- <br />- <br />LG <br />- <br />- <br />- <br />Marcus Fernandez <br />- <br />- <br />LT <br />LT <br />LT <br />LT <br />- <br />Tyler Browning <br />- <br />- <br />- <br />- <br />- <br />- <br />ST <br />Ran Fesler <br />- <br />- <br />LT <br />LT <br />LT <br />- <br />LT <br />Robert Redd <br />- <br />UG <br />UG <br />UG <br />UG <br />UG <br />- <br />Razi Molloy <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Eric Lorenson <br />- <br />- <br />ST <br />ST <br />- <br />ST <br />ST <br />* *Fred Taylor <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />*Reggie Long <br />ST <br />ST <br />ST <br />ST <br />ST <br />*Night shift <br />* *Yeh and Associates — Subcontractor HWY 67 <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />Page 4 of 6 MLE2 WE 09.21.13.doc <br />