Laserfiche WebLink
amec'9- <br />The contractor continued spreading a 6 inch thick layer of topsoil on the downstream slope of the HWY <br />embankment. <br />Excavation occurred around the existing crib wall exposing the timber facing in preparation of dismantling the wall. <br />South MSE Wall: <br />The structural mat wire basket portion of the MSE wall was completed during this reporting period. <br />11) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: <br />topsoil stripping/Stockpiling, production drilling and blasting, Cut to Fill ADR Haul Road (HR), HWY 67 construction, <br />PSSA Toe Berm Fill placement and compaction, Underground remediation, clay (SLF) processing and Drain Cover Fill <br />(DCF) production and processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample No. 52 was obtained during this reporting period <br />DCF: Sample No. 12 thru 20 were obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on September 1811 between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& 1% Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne M. Clark Date: 09.21.13 <br />Thorne M Clark <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By:i f/ <br />Date: kP - /S __ /3' <br />Page 3 of MLE2 WE 09.21.13.doc <br />