My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-10-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:20 PM
Creation date
10/23/2013 8:52:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/21/2013
Doc Name
Weekly CQA Reports- 9/21/13 and 9/28/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'9- <br />The contractor continued spreading a 6 inch thick layer of topsoil on the downstream slope of the HWY <br />embankment. <br />Excavation occurred around the existing crib wall exposing the timber facing in preparation of dismantling the wall. <br />South MSE Wall: <br />The structural mat wire basket portion of the MSE wall was completed during this reporting period. <br />11) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: <br />topsoil stripping/Stockpiling, production drilling and blasting, Cut to Fill ADR Haul Road (HR), HWY 67 construction, <br />PSSA Toe Berm Fill placement and compaction, Underground remediation, clay (SLF) processing and Drain Cover Fill <br />(DCF) production and processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample No. 52 was obtained during this reporting period <br />DCF: Sample No. 12 thru 20 were obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on September 1811 between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& 1% Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne M. Clark Date: 09.21.13 <br />Thorne M Clark <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By:i f/ <br />Date: kP - /S __ /3' <br />Page 3 of MLE2 WE 09.21.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.