My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2013-10-22_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:24 PM
Creation date
10/23/2013 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/2013
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Julia Keedy <br />RMCC Combined SWSP <br />October 21, 2013 <br />Conditions of Approval <br />Page 6 of 9 <br />I hereby approve this SWSP amendment in accordance with §37 -90- 137(11), C.R.S., <br />subject to the original terms and conditions except where changed below. For simplicity all <br />terms and conditions are listed below: <br />This amendment is approved with an effective date of August 1, 2013 and shall be <br />valid through December 31, 2013 unless otherwise revoked or modified. The plan <br />may be extended through December 31, 2014 if a copy of the lease renewal is submitted <br />to the State Engineer's Office prior to December 31, 2013. If this plan will not be made <br />absolute by a water court action by the plan's expiration date, a renewal request must be <br />submitted to this office with the statutory fee (currently $257 /pit) for each gravel pit no later <br />than October 15, 2013, or three months prior to the SWSP expiration if the SWSP <br />approval period is extended. <br />2. Well permit no. 767111 -F was approved for the current use and exposed pond surface <br />area of the Bromley Lakes site in accordance with §37 -90- 137(2) and (11), C.R.S. <br />3. The total area of pond surface exposed for each of the pits shall not exceed those <br />values listed in Tables 1A & 1 B of this approval. Should the total surface area exposed <br />exceed those amounts, an amendment will need to be filed with this office. <br />4. The total product mined at the Bromley Lakes site shall not exceed the amount listed in <br />Tables 1A & 1 B of this approval, which results in 44.1 acre -feet of water lost with the <br />mined product through July 2014. <br />5. Total consumption at the Bromley Lakes site and North Tower Pit must not exceed the <br />amounts listed in Tables 1A & 1 B of this approval unless an amendment is made to this <br />plan. <br />6. Approval of this plan is for the purposes as stated herein. Any additional uses of this <br />water must first be approved by this office. Any future additional historic consumptive <br />use credit given (e.g., agricultural water transfer) for this site must consider all previous <br />credits given. <br />7. All releases of replacement water must be sufficient to cover all out -of- priority depletions <br />in time, place, and amount and must be made under the direction and /or the approval of <br />the water commissioner. The release of replacement water may be aggregated to <br />maximize beneficial use. The water commissioner and /or the division engineer shall <br />determine the rate and timing of an aggregated release. <br />8. The replacement water, which is the subject of this plan cannot be sold or leased to any <br />other entity. As a condition of subsequent renewals of this substitute water supply plan, <br />the replacement water must be appurtenant to this site until a plan for augmentation is <br />obtained. All replacement water must be concurrent with depletions in quantity, timing, <br />and locations. According to an affidavit dated August 4, 2010, the Applicant dedicated 70 <br />shares of the Fulton Ditch as replacement water solely to this SWSP and any <br />subsequent SWSPs, for as long as there are depletions at these gravel pit sites or until <br />such time as another replacement source is obtained. For the purposes of this SWSP, <br />this affidavit will be accepted for the dedication of the shares; however, if the <br />State Engineer determines that a different affidavit or dedication process is <br />necessary to assure proper dedication of the shares, additional information may <br />be required prior to future SWSP approvals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.