My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2013-10-22_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:24 PM
Creation date
10/23/2013 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/2013
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Julia Keedy Page 4 of 9 <br />RMCC Combined SWSP <br />October 21, 2013 <br />• distance from McCanne Ditch to alluvial boundary = 3,500 feet <br />All other depletions, which occur west of the McCanne Ditch are lagged to the South <br />Platte River using the following Glover parameters: <br />• specific yield = 0.2; <br />• distance from the stream to the alluvial boundary = 5,300 feet <br />• transmissivity = 100,000 gallons per day per foot; <br />• distance from the centroid of the exposed ground water to the stream = 1,016 feet. <br />The distance to the alluvial boundary is based on the Applicant's analysis of geologic <br />cross sections showing that the alluvium is pinched at approximately the railroad east of the <br />site. <br />The Applicant wrapped the remaining 5% tail of the depletions into the previous months. <br />The depletions factors for the areas west and east of the McCanne Ditch as shown in the <br />following table: <br />Bromley Site Depletion Factors <br />Month <br />North Tower Pit <br />Cell 3 /Lot 1 <br />Cell <br />Lot 2 <br />Plant Site <br />(beginning Nov. 2013) <br />1 <br />0.4529 <br />0.6415 <br />2 <br />0.2696 <br />0.2183 <br />3 <br />0.0755 <br />0.0677 <br />4 <br />0.0454 <br />0.0436 <br />5 <br />0.0345 <br />0.0289 <br />6 <br />0.0282 <br />7 <br />0.0234 <br />8 <br />0.0196 <br />9 <br />0.0164 <br />10 <br />0.0136 <br />11 <br />0.0114 <br />12 <br />0.0095 <br />Total <br />1.0 <br />1.0 <br />The projected lagged depletions to hit the river between August 2013 and July 2014 total <br />247.2 acre -feet. This value includes depletions from past activity that hit the river during this <br />timeframe. <br />Replacements <br />The replacement sources for this SWSP include the following: <br />• Consumptive use portion of RMCC's 70 Fulton Ditch shares. <br />• Consumptive use credits from the Fulton Ditch shares previously stored in City of <br />Brighton storage (Kenneth Mitchell Lake). <br />• Water lease with City of Brighton for up to 250 acre -feet per year, currently contracted <br />through December 2013, which the Applicant intends to renew in 2014. <br />
The URL can be used to link to this page
Your browser does not support the video tag.