My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2013-10-22_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:24 PM
Creation date
10/23/2013 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/2013
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sip n1 2Z)1 <br />Table IB <br />Ready Mixed Concrete Company - Bromley Lakes Site and forth To%cr Pit <br />Depiction Analysis (November 2013 - December 2015) <br />Proposed MN'SP Operations <br />(all values in acre -feet unless specified) <br />Notes <br />(1 I 1 Total surface area of exposed ground water at Bromley Lakes Lot 2 and the Plant Site is conservatively projected to be 4 3 acres through July 2014 and <br />I acre from August 2014 through December 2015 <br />(121 Net evaporation equals exposed ground %voter area multiplied by the net e%oporation rate. [ I I I X (41 12 <br />[ 131 Production above and below the static ground water (G W) table Since the exact timing of production above the GIN table is not known, projections <br />conservatively show all production below the GIN table <br />[ 141 Wash water and aggregate moisture content equals 21. by weight for gravel mined above the ground %voter table and 41„ by weight for gravel mined <br />below the ground %voter table <br />(151 Total evaporation and gravel mining depletion equals [ 121 - [151 <br />(161 Bromley Lakes Lot 2 and Plant Site metered dewaterng pumping to the McCanne Ditch <br />1171 Dewatenng pumping depletion is equal to the dewatenng pumping in column 16 lagged over 5 months during the months that RMCC is not dewaterng <br />(i a column 16 equals zero) <br />1181 Total logged depletion equals the Bromley Lakes Lot 2 and Plant Site evaporation and gravel depletion in column 15 lagged over 5 months plus the <br />dewatenng pumping depletion in column 17 <br />[191 Total lagged site depletion for North Tower Pit, Bromley Lake, Cell 2. Cell 3, Lot 1, and Lot 2 and the Plant Site equals 1101 , (181 <br />BBA <br />Bromley Lakes Lot 2 & the Plant Site <br />Total <br />F \posed <br />Net <br />Gravel Production <br />Aggregate <br />Total <br />Dewaiering De%%atering <br />Total <br />Lagged <br />Ground <br />Evaporation <br />Above <br />Below <br />Moisture <br />Fvapand <br />Pumping <br />Pumping <br />Lagged <br />Site <br />Water Area <br />GIN Table <br />GW Table <br />Content <br />Gravel <br />Volume <br />Depletion <br />Depletion <br />Depletion <br />(acres) <br />(tons) <br />(tons) <br />Depletion <br />Depletion <br />Month <br />[1 11 <br />12 <br />13 1 <br />[141 <br />rl5L__ <br />16 1 <br />[171 <br />1181 <br />19 <br />Nov <br />43 <br />04 <br />0 <br />110,005- <br />3,2 <br />3.6 <br />121.5 <br />0 <br />2.3 <br />14.6 <br />Dec 2013 <br />4 3 <br />04 <br />0 <br />80,000 <br />2.4 <br />27 <br />829 <br />0 <br />2.6 <br />11.3 <br />Jan 2014 <br />4 3 <br />03 <br />0 <br />80,000 <br />2.4 <br />17 <br />85.6 <br />0 <br />2.6 <br />10.1 <br />Feb <br />43 <br />04 <br />0 <br />80,000 <br />2.4 <br />18 <br />85.6 <br />0 <br />27 <br />10.0 <br />Mar <br />4 3 <br />06 <br />0 <br />110,000 <br />3.2 <br />3.8 <br />77.3 <br />0 <br />3.5 <br />11.2 <br />Apr <br />4 3 <br />10 <br />0 <br />0 <br />0 <br />10 <br />0 <br />288 <br />307 <br />42.4 <br />May <br />4 3 <br />13 <br />0 <br />0 <br />0 <br />13 <br />0 <br />11.4 <br />110 <br />28.6 <br />Jun <br />4 3 <br />19 <br />0 <br />0 <br />0 <br />1.9 <br />0 <br />5.8 <br />T7 <br />27.4 <br />Jul <br />4 3 <br />20 <br />0 <br />0 <br />0 <br />2.0 <br />0 <br />2.2 <br />4.2 <br />36.6 <br />Aug <br />10 <br />04 <br />0 <br />0 <br />0 <br />04 <br />0 <br />0 <br />0.9 <br />23.0 <br />Sep <br />1.0 <br />0.3 <br />0 <br />0 <br />0 <br />0 3 <br />0 <br />0 <br />(is <br />202 <br />Oct <br />1.0 <br />0.2 <br />0 <br />0 <br />0 <br />0.2 <br />0 <br />0 <br />0.4 <br />172 <br />Nov <br />10 <br />0 1 <br />0 <br />110,000 <br />3.2 <br />3 3 <br />85.6 <br />0 <br />2.3 <br />13,5 <br />Dec 2014 <br />1.0 <br />01 <br />0 <br />80,000 <br />2 4 <br />2 4 <br />829 <br />0 <br />2.3 <br />10.5 <br />Jan 3015 <br />Lo <br />01 <br />0 <br />80,000 <br />2.4 <br />24 <br />85.6 <br />0 <br />2.3 <br />9A <br />Feb <br />1.0 <br />0. I <br />0 <br />80,000 <br />2 4 <br />25 <br />856 <br />0 <br />2.4 <br />9.4 <br />Mar <br />1.0 <br />0.1 <br />0 <br />110,000 <br />3 2 <br />3 4 <br />773 <br />0 <br />3.1 <br />10.5 <br />Apr <br />1.0 <br />0.2 <br />0 <br />140,000 <br />4 l <br />4 4 <br />85.6 <br />0 <br />3.9 <br />13.6 <br />May <br />1 0 <br />03 <br />0 <br />140,000 <br />4 1 <br />4 4 <br />82.9 <br />0 <br />4 2 <br />16.7 <br />Jun <br />1 0 <br />04 <br />0 <br />140,000 <br />4 1 <br />46 <br />85.6 <br />0 <br />4 4 <br />20.7 <br />Jul <br />1.0 <br />0.5 <br />0 <br />160,000 <br />17 <br />5.2 <br />82.9 <br />0 <br />4.9 <br />23.5 <br />_ <br />Aug <br />1.0 <br />0.4 <br />0 <br />160,000 <br />4 7 <br />5 1 <br />85.6 <br />0 <br />5.0 <br />23.0 <br />Sep <br />Lo <br />03 <br />0 <br />160,000 <br />4.7 <br />50 <br />85.6 <br />0 <br />5.0 <br />20.5 <br />Oct <br />10 <br />02 <br />0 <br />140,000 <br />4.1 <br />4 3 <br />82.9 <br />0 <br />4.6 <br />17.3 <br />Nov <br />I.0 <br />0.1 <br />0 <br />110,000 <br />12 <br />3 3 <br />85.6 <br />0 <br />3.8 <br />12.9 <br />Dec 2015 <br />LO <br />0.1 <br />0 <br />80,000 <br />24 <br />2 4 <br />82.9 <br />0 <br />3,0 <br />10 1 <br />Nov 13-Jul 14 Total <br />8A <br />0 <br />460,000 <br />13.5 <br />21.9 <br />453.0 <br />48.3 <br />69 1 <br />182.3 <br />2014 -2015 Total <br />19 <br />0 <br />1,040.000 <br />30.6 <br />33.5 <br />754.0 <br />0 <br />31 7 <br />1113 <br />Au g -Dec 2015 Total <br />1 i <br />0 <br />650,000 <br />19 1 <br />20.2 <br />432.6 <br />0 <br />114 <br />83.8 <br />Notes <br />(1 I 1 Total surface area of exposed ground water at Bromley Lakes Lot 2 and the Plant Site is conservatively projected to be 4 3 acres through July 2014 and <br />I acre from August 2014 through December 2015 <br />(121 Net evaporation equals exposed ground %voter area multiplied by the net e%oporation rate. [ I I I X (41 12 <br />[ 131 Production above and below the static ground water (G W) table Since the exact timing of production above the GIN table is not known, projections <br />conservatively show all production below the GIN table <br />[ 141 Wash water and aggregate moisture content equals 21. by weight for gravel mined above the ground %voter table and 41„ by weight for gravel mined <br />below the ground %voter table <br />(151 Total evaporation and gravel mining depletion equals [ 121 - [151 <br />(161 Bromley Lakes Lot 2 and Plant Site metered dewaterng pumping to the McCanne Ditch <br />1171 Dewatenng pumping depletion is equal to the dewatenng pumping in column 16 lagged over 5 months during the months that RMCC is not dewaterng <br />(i a column 16 equals zero) <br />1181 Total logged depletion equals the Bromley Lakes Lot 2 and Plant Site evaporation and gravel depletion in column 15 lagged over 5 months plus the <br />dewatenng pumping depletion in column 17 <br />[191 Total lagged site depletion for North Tower Pit, Bromley Lake, Cell 2. Cell 3, Lot 1, and Lot 2 and the Plant Site equals 1101 , (181 <br />BBA <br />
The URL can be used to link to this page
Your browser does not support the video tag.