Laserfiche WebLink
-rn-en� n1 lei} �- <br />Table IA <br />Ready Mixed Concrete Company - Bromle3 Lakes Site and North Tower Pit <br />Depletion Analysis (November 2013 - December 2015) <br />Proposed SWSP Operations <br />(all values in acre -feet unless specified) <br />Notes <br />111 Total surface area of exposed ground water in Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit is conservatively projected to be 48 9 acres ( ?0 6 acres at <br />Bromley Lakes Cell 2, 0 3 acres at Bromley Lakes Cell 3 and Lot 1, and 28 acres at North Tower Pit) <br />[2) Gross evaporation rate equals 44 52 inches (3 71 fl) per year, based upon NOAA Evaporation Atlas Monthl) distribution based upon SB -120 Guidelines <br />[3) Effective precipitation rate equals 700, of total precipitation, based upon average precipitation at the Brighton weather station <br />[41 Net evaporation equals [2] - 131 <br />[5) Historical ET credits at the North Tower Pit from 7 4 acres of pasture gross using ground water at a depth of4 feet (does not include an effective precipitation credit) <br />[6] Net evaporation equals the net evaporation volume minus the historical ET credits, [ 1 ] s [4J 12 - [51 <br />171 Production within a slum wall lined pit (t c Ce113 Lot I or KML l) and outside of a slurry wall lined pit Since the exact timing of production within the slum wall <br />lined pit is not known, projections conservatively show all production outside of a slurry wall lined pit <br />[81 Wash water and aggregate moisture content equals 2 1Y by weight for gravel mined within a slurry wall lined pit and 4 10 by weight for gravel mined outside a slurry wall <br />lined pit <br />191 Total evaporation and gravel mining depletion equals [6) . [81 <br />[ 101 Lagged site depletion equals the Bromlev Lakes Cell 2, Cell 3, and Lot I and North Tower Pit evaporation and gravel depletion in column [91 lagged over 12 months <br />plus depletions from previous lagging patterns <br />Bromley Lakes <br />Cell 2, Cell <br />a and Lot I <br />& North Tower <br />Pit <br />Exposed <br />Gross <br />Effective <br />Net <br />Historical <br />Net <br />Gravel Production <br />Aggregate <br />Total <br />Ground <br />Evaporation <br />Precipitation <br />Evaporation <br />North <br />Evaporation <br />Within <br />Outside <br />Moisture <br />Evapand <br />Lagged <br />Water Area <br />Rate <br />Rate <br />Rate <br />Tower Pit <br />Lined Pit <br />Lined Pit <br />Content <br />Gravel <br />Depletion <br />(acres) <br />(inches) <br />(inches) <br />(inches) <br />ET Credits <br />(tons) <br />(tons) <br />Depletion <br />Depletion <br />Month <br />I <br />2 1 <br />[31 <br />141 <br />5 <br />6 1 <br />[71 <br />8 <br />191 <br />1101 <br />Nov <br />48.9 <br />1.78 <br />0.6 <br />1.2 <br />00 <br />4 7 <br />0 <br />0 <br />0 <br />47 <br />12,2 <br />Dec 2013 <br />48.9 <br />1.34 <br />03 <br />1 1 <br />0 <br />44 <br />0 <br />0 <br />0 <br />44 <br />8,8 <br />Jan 2014 <br />489 <br />1 34 <br />0A <br />1 0 <br />0 <br />40 <br />0 <br />0 <br />0 <br />4.0 <br />75 <br />Feb <br />48.9 <br />156 <br />01 <br />1 3 <br />0 <br />51 <br />0 <br />0 <br />0 <br />51 <br />73 <br />Mar <br />48.9 <br />245 <br />0.8 <br />1.6 <br />0.0 <br />6 5 <br />0 <br />0 <br />0 <br />6.5 <br />7.7 <br />Apr <br />48.9 <br />4.01 <br />1.3 <br />2 8 <br />0.1 <br />114 <br />0 <br />140,000 <br />4.1 <br />5 5 <br />1 1.8 <br />Mav <br />48.9 <br />5 34 <br />16 <br />3.8 <br />02 <br />15.3 <br />0 <br />140,000 <br />4 1 <br />:9 .3 <br />15,6 <br />Jun <br />489 <br />646 <br />1.1 <br />53 <br />05 <br />21 2 <br />0 <br />140,000 <br />4 1 <br />25.3 <br />193 <br />Jul <br />48.9 <br />6.68 <br />1.1 <br />5.6 <br />0.7 <br />22.1 <br />0 <br />160,000 <br />4.7 <br />26.8 <br />22.5 <br />Aug <br />489 <br />6.01 <br />1 2 <br />4.8 <br />0.6 <br />18.8 <br />0 <br />160,000 <br />4 7 <br />215 <br />22 1 <br />Sep <br />48.9 <br />4.45 <br />0,9 <br />3.6 <br />0.4 <br />14.1 <br />0 <br />160,000 <br />43 <br />18 8 <br />19.7 <br />Oct <br />489 <br />3 12 <br />05 <br />26 <br />0.2 <br />10.5 <br />0 <br />140,000 <br />4 1 <br />14,6 <br />16.8 <br />Nov <br />489 <br />1 78 <br />0.6 <br />1 2 <br />0.0 <br />4,7 <br />0 <br />0 <br />0 <br />47 <br />11.2 <br />Dec 2014 <br />489 <br />134 <br />03 <br />1.1 <br />0 <br />44 <br />0 <br />0 <br />0 <br />44 <br />82 <br />Jan 2015 <br />48,9 <br />1.34 <br />0.4 <br />1.0 <br />0 <br />40 <br />0 <br />0 <br />0 <br />4.0 <br />7.1 <br />Feb <br />48.9 <br />1.56 <br />03 <br />1 3 <br />0 <br />5.1 <br />0 <br />0 <br />0 <br />5.1 <br />7.0 <br />Mar <br />48.9 <br />245 <br />0.8 <br />L6 <br />00 <br />65 <br />0 <br />0 <br />0 <br />6.5 <br />75 <br />Apr <br />489 <br />4.01 <br />1,2 <br />2.8 <br />01 <br />11 4 <br />0 <br />0 <br />0 <br />11.4 <br />9.7 <br />Ma) <br />48.9 <br />5 34 <br />1.6 <br />3, 8 <br />02 <br />152 <br />0 <br />0 <br />0 <br />15 2 <br />12.5 <br />Jun <br />489 <br />6.46 <br />1.1 <br />5.3 <br />05 <br />21 2 <br />0 <br />0 <br />0 <br />21.2 <br />16.3 <br />Jul <br />48.9 <br />668 <br />1.1 <br />5,6 <br />07 <br />22.1 <br />0 <br />0 <br />0 <br />22.1 <br />18.6 <br />Aug <br />489 <br />601 <br />1 2 <br />4.8 <br />0.6 <br />18.8 <br />0 <br />0 <br />0 <br />18.8 <br />18.0 <br />Sep <br />489 <br />445 <br />0.9 <br />3.6 <br />0.4 <br />14.1 <br />0 <br />0 <br />0 <br />14.1 <br />15.5 <br />Oct <br />48.9 <br />3.12 <br />01 <br />26 <br />02 <br />10.5 <br />0 <br />0 <br />0 <br />10.5 <br />128 <br />Nov <br />48.9 <br />1 7 <br />06 <br />12 <br />0.0 <br />4,7 <br />0 <br />0 <br />0 <br />4.7 <br />91 <br />Dec 2015 <br />48.9 <br />1.34 <br />0.3 <br />1.1 <br />0 <br />4.4 <br />0 <br />0 <br />0 <br />4A <br />7,1 <br />Nov 13 -Ju114 Total <br />- <br />3094 <br />7.3 <br />23.6 <br />1.7 <br />94.5 <br />0 <br />580,000 <br />17,1 <br />111,6 <br />113,2 <br />15 <br />2014-30 Total <br />44.52 <br />10.0 <br />34.5 <br />2.8 <br />137.9 <br />0 <br />460,000 <br />13.5 <br />151.4 <br />156,7 <br />Au , -Dec 2015 Total.1 <br />1670 <br />3.5 <br />13.2 <br />1 2 <br />52.5 <br />0 <br />0 <br />0 <br />52.5 <br />62.4 <br />Notes <br />111 Total surface area of exposed ground water in Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit is conservatively projected to be 48 9 acres ( ?0 6 acres at <br />Bromley Lakes Cell 2, 0 3 acres at Bromley Lakes Cell 3 and Lot 1, and 28 acres at North Tower Pit) <br />[2) Gross evaporation rate equals 44 52 inches (3 71 fl) per year, based upon NOAA Evaporation Atlas Monthl) distribution based upon SB -120 Guidelines <br />[3) Effective precipitation rate equals 700, of total precipitation, based upon average precipitation at the Brighton weather station <br />[41 Net evaporation equals [2] - 131 <br />[5) Historical ET credits at the North Tower Pit from 7 4 acres of pasture gross using ground water at a depth of4 feet (does not include an effective precipitation credit) <br />[6] Net evaporation equals the net evaporation volume minus the historical ET credits, [ 1 ] s [4J 12 - [51 <br />171 Production within a slum wall lined pit (t c Ce113 Lot I or KML l) and outside of a slurry wall lined pit Since the exact timing of production within the slum wall <br />lined pit is not known, projections conservatively show all production outside of a slurry wall lined pit <br />[81 Wash water and aggregate moisture content equals 2 1Y by weight for gravel mined within a slurry wall lined pit and 4 10 by weight for gravel mined outside a slurry wall <br />lined pit <br />191 Total evaporation and gravel mining depletion equals [6) . [81 <br />[ 101 Lagged site depletion equals the Bromlev Lakes Cell 2, Cell 3, and Lot I and North Tower Pit evaporation and gravel depletion in column [91 lagged over 12 months <br />plus depletions from previous lagging patterns <br />