Laserfiche WebLink
Table 1B <br />Ready Mixed Concrete Company - Bromley Lakcs Site & North Tower Pit <br />Depletion Analysis (August 2013 - December 2015) <br />Proposed SNVSP Operations <br />(all values in acre -feet unless specified) <br />11 <br />Notes: <br />ill) Number of days there was a call on the South Platte River. Conservatively projected to have a call for the entire SWSP period. <br />(121 Out -of- priority depletion equals the fraction of the total net depletion that occurred when there was a call on the South Platte River, equal to [ 101 • ([111 / N of <br />days in month). <br />1131 RMCC's Fulton share deliveries at RMCCs Erger Lateral or Brighton's Midland or 124th Ave augmentation stations, as reposed by RMCC or Brighton. <br />[ 141 Fulton Ditch historical consumptive use (HCU) replacement credit from RMCC's 70 shares, equal to the lesser of 1.76 ac- fVshare /year average historical <br />consumptive use distributed monthly (based upon the S.ACWSD change case engineering report for Case No 2001CW258), and the total Fulton Ditch <br />Deliveries, 1161, multiplied by the consumptive use factors presented in RMCC's SWSP renewal request (Apr = 0.281, Ma}-0.687, Jun - 0.758, Jul= 0.786, <br />Au6 0.764, Sep - 0.688, Oct = 0.465, based upon the engineering; report for Case No 2001CW258). <br />t 15) Total replacement requirement is the total of the out -of- priority depletion and the Fulton Ditch return flow obligation, equal to [121- [ 14) if[14] is negative, <br />otherwise equal to [ 121. <br />[ 161 Fulton HCU credits delivered directly to the river. <br />117) Required release of stored Fulton Ditch credits to South Platte River in order to replace the given month's depletions, equal to [ 151 - 1161 if there is water in <br />storage, Col (211. <br />[ 181 Stored Fulton Ditch credits released to South Platte River in order to replace depletions. Projections calculated as the minimum of the release requirement <br />(equal to previous [22] + (I7)) and RMCC's previous EOM storage given in Col [21). <br />1191 Surplus Fulton credits available for diversion to storage based on Fulton Ditch credits, 1141, in excess ofthe out -of- priority depletions, [12). <br />[201 Brighton lease replacement equals [ 15] - 116] -1181, limited to 250 ac -ft per year. <br />[21) RMCCs storage in Brighton's Kenneth Mitchell Lake, Erger's Pond or 124th Storage Pond. Equal to previous month's storage minus estimated evaporation <br />and augmentation releases plus surplus Fulton credits delivereddo storage. <br />(221 Remaining operations replacement requirement equals previous 1221 + [151- (16) - [ 181 - [20), if positive, otherwise equal to zero. <br />(331 Cell 3/RMPI dewatering pumping to the South Platte River. Expected to be minimal due to the installation ofthe slurry wall liner around Cell 31RMPl. <br />8 BA <br />V <br />Y) <br />C2 <br />-4—S <br />a <br />Number Out -of- <br />Fulton Replacement <br />Total <br />Fulton <br />Required Actual <br />Surplus <br />Brighton <br />RMCC's <br />Remaining <br />Dewatering <br />of Days Priority <br />Share CU Credit <br />Replacement <br />HCU <br />Aug Release Aug Release <br />Fulton <br />Lease <br />EOM <br />Operations <br />Pumping <br />Out -of- Depletion <br />Deliveries from Fulton <br />Requirement <br />Direct to <br />From Storage From Storage <br />Credit to <br />Replacement <br />Storage <br />Replacement <br />To River <br />Priority <br />Ditch <br />River <br />To River To River <br />Storage <br />Requirement <br />Month <br />II 12 <br />13 14 <br />15 1 <br />[161 <br />1171 IS 1 <br />[191 <br />1201 <br />21 <br />22 <br />23 <br />Aug <br />31 25.0 <br />41.7 31.9 <br />25.0 <br />25.0 <br />0 0 <br />6.8 <br />0 <br />28.4 <br />0 <br />Sep <br />30 21.6 <br />21.6 14.9 <br />21.6 <br />14.9 <br />6.7 6.7 <br />0 <br />0 <br />20.7 <br />0 <br />Oct <br />31 18.3 <br />4.6 2.1 <br />18.3 <br />2.1 <br />16.2 16.2 <br />0 <br />0 <br />4.1 <br />0 <br />11 <br />Notes: <br />ill) Number of days there was a call on the South Platte River. Conservatively projected to have a call for the entire SWSP period. <br />(121 Out -of- priority depletion equals the fraction of the total net depletion that occurred when there was a call on the South Platte River, equal to [ 101 • ([111 / N of <br />days in month). <br />1131 RMCC's Fulton share deliveries at RMCCs Erger Lateral or Brighton's Midland or 124th Ave augmentation stations, as reposed by RMCC or Brighton. <br />[ 141 Fulton Ditch historical consumptive use (HCU) replacement credit from RMCC's 70 shares, equal to the lesser of 1.76 ac- fVshare /year average historical <br />consumptive use distributed monthly (based upon the S.ACWSD change case engineering report for Case No 2001CW258), and the total Fulton Ditch <br />Deliveries, 1161, multiplied by the consumptive use factors presented in RMCC's SWSP renewal request (Apr = 0.281, Ma}-0.687, Jun - 0.758, Jul= 0.786, <br />Au6 0.764, Sep - 0.688, Oct = 0.465, based upon the engineering; report for Case No 2001CW258). <br />t 15) Total replacement requirement is the total of the out -of- priority depletion and the Fulton Ditch return flow obligation, equal to [121- [ 14) if[14] is negative, <br />otherwise equal to [ 121. <br />[ 161 Fulton HCU credits delivered directly to the river. <br />117) Required release of stored Fulton Ditch credits to South Platte River in order to replace the given month's depletions, equal to [ 151 - 1161 if there is water in <br />storage, Col (211. <br />[ 181 Stored Fulton Ditch credits released to South Platte River in order to replace depletions. Projections calculated as the minimum of the release requirement <br />(equal to previous [22] + (I7)) and RMCC's previous EOM storage given in Col [21). <br />1191 Surplus Fulton credits available for diversion to storage based on Fulton Ditch credits, 1141, in excess ofthe out -of- priority depletions, [12). <br />[201 Brighton lease replacement equals [ 15] - 116] -1181, limited to 250 ac -ft per year. <br />[21) RMCCs storage in Brighton's Kenneth Mitchell Lake, Erger's Pond or 124th Storage Pond. Equal to previous month's storage minus estimated evaporation <br />and augmentation releases plus surplus Fulton credits delivereddo storage. <br />(221 Remaining operations replacement requirement equals previous 1221 + [151- (16) - [ 181 - [20), if positive, otherwise equal to zero. <br />(331 Cell 3/RMPI dewatering pumping to the South Platte River. Expected to be minimal due to the installation ofthe slurry wall liner around Cell 31RMPl. <br />8 BA <br />V <br />Y) <br />C2 <br />-4—S <br />a <br />