My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_HYDROLOGY - M1977436
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977436
>
2013-10-22_HYDROLOGY - M1977436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:24 PM
Creation date
10/23/2013 8:46:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/2013
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seek Zo 13 <br />�-rn2rjm ei I % <br />Table IA. <br />Really Nlixed Concrete Company - Bromley Lakes Site and North Tower Pit <br />Depletion Analysis (November 2013 - December 2015) <br />Proposed SWSP Operations <br />(all values in acre-feet unless specified) <br />Notes <br />11) Total surface area of exposed ground water in Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit is conservatively projected to be 48 9 acres (20 6 acres at <br />Bromley Lakes Cell 2, 0 3 acres at Bromley Lakes Cell 3 and Lot 1, and 28 acres at North Tower Pit) <br />(2) Gross evaporation rate equals 44 52 inches (3 71 e) per year, based upon NOAA Evaporation Atlas Monthly distribution based upon SB -120 Guidelines <br />[3) Effective precipitation rate equals 70Qo of total precipitation, based upon average precipitation at the Brighton weather station <br />[4) Net evaporation equals [2] - (31 <br />[51 Historical ET credits at the North Tower Pit from 7 4 acres of pasture gross using ground water at a depth of 4 feet (does not include an effective precipitation credit) <br />[61 Net evaporation equals the net evaporation volume minus the historical ET credits, 11 ] ,x 14J 12.151 <br />(71 Production within a slurry wall lined pit (i a Ce113 Lot I or KML I) and outside of a slurry wall lined pit Since the exact timing of production within the slurry wall <br />lined pit is not known, projections conservatively show all production outside of a slurry wall lined pit <br />[81 Wash water and aggregate moisture content equals 21. by weight for gravel mined within a slurry wall lined pit and 40o by weight for gravel mined outside a slurry wall <br />lined pit <br />[91 Total evaporation and gravel mining depletion equals [61 . [8] <br />1101 Lagged site depletion equals the Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit evaporation and gravel depletion in column 191 lagged over 12 months <br />plus depletions from previous lagging patterns <br />rAL- BBA <br />Bromley Lakes Cell 2, Cell 3 and Lot I <br />& North Tower Pit <br />Exposed <br />Gross <br />Effective <br />Net <br />Historical <br />Net <br />Gravel Production <br />Aggregate <br />Total <br />Ground <br />Water Area <br />Evaporation <br />Rate <br />Precipitation <br />Rate <br />Evaporation <br />Rate <br />North <br />Tower Pit <br />Evaporation <br />Within <br />Lined Pit <br />Outside <br />Lined Pit <br />Moisture <br />Content <br />Evap and <br />Gravel <br />Lagged <br />Depletion <br />(acres) <br />(inches) <br />(inches) <br />(inches) <br />ET Credits <br />(tons) <br />(tons) <br />Depletion <br />Depletion <br />Month <br />111 <br />[21 <br />3 <br />4 <br />5 <br />6 1 <br />[71 <br />181 <br />9 <br />10 <br />Nov <br />48.9 <br />1.78 <br />0.6 <br />I ? <br />0.0 <br />4.7 <br />0 <br />0 <br />0 <br />4.7 <br />12.2 <br />Dec 2013 <br />48.9 <br />1.34 <br />03 <br />I 1 <br />0 <br />4.4 <br />0 <br />0 <br />0 <br />4.4 <br />8.8 " <br />Jan 2014 <br />48.9 <br />1.34 <br />0.4 <br />1 0 <br />0 <br />4.0 <br />0 <br />0 <br />0 <br />4.0 <br />75 <br />Feb <br />48.9 <br />1 5 <br />0.3 <br />1.3 <br />0 <br />51 <br />0 <br />U <br />0 <br />5.1 <br />73 <br />Mar <br />48,9 <br />2.45 <br />0.8 <br />1.6 <br />0.0 <br />6 5 <br />0 <br />0 <br />0 <br />6.5 <br />7.7 <br />Apr <br />48.9 <br />4.01 <br />1.2 <br />18 <br />0.1 <br />11.4 <br />0 <br />140,000 <br />4.1 <br />15.5 <br />11.8 <br />May <br />46.9 <br />5 34 <br />16 <br />3.8 <br />02 <br />15.2 <br />0 <br />140,000 <br />4.1 <br />19.3 <br />15.6 <br />Jun <br />48.9 <br />6,46 <br />1.1 <br />5.3 <br />05 <br />21.2 <br />0 <br />140,000 <br />4 1 <br />25.3 <br />19.7 <br />Jul <br />48.9 <br />6.68 <br />1.1 <br />5.6 <br />0.7 <br />22.1 <br />0 <br />160,000 <br />4.7 <br />261 <br />22.5 <br />Aug <br />48.9 <br />6.01 <br />1 2 <br />4.8 <br />0.6 <br />18.8 <br />U <br />160,000 <br />4.7 <br />215 <br />211 <br />Sep <br />48.9 <br />4.45 <br />0.9 <br />3.6 <br />0.4 <br />14.1 <br />U <br />160,000 <br />4.7 <br />18.8 <br />19.7 <br />Oct <br />48.9 <br />3.12 <br />0.5 <br />2.6 <br />0.2 <br />10.5 <br />0 <br />140,000 <br />4.1 <br />14.6 <br />161 <br />Nov <br />48.9 <br />1.78 <br />0.6 <br />1.2 <br />0.0 <br />4.7 <br />0 <br />0 <br />0 <br />47 <br />11.2 <br />Dec 2014 <br />48.9 <br />1.34 <br />03 <br />1.1 <br />0 <br />44 <br />0 <br />0 <br />0 <br />4.4 <br />8.2 <br />Jan 2015 <br />48.9 <br />1.34 <br />0.4 <br />1.0 <br />0 <br />40 <br />0 <br />0 <br />0 <br />4.0 <br />7.1 <br />Feb <br />48.9 <br />1.56 <br />0.3 <br />13 <br />0 <br />5.1 <br />0 <br />0 <br />0 <br />5.1 <br />7A <br />Mar <br />48.9 <br />245 <br />0.8 <br />L6 <br />0.0 <br />6.5 <br />0 <br />0 <br />0 <br />6.5 <br />7.5 <br />Apr <br />489 <br />4.01 <br />1.2 <br />2.8 <br />01 <br />11A <br />0 <br />0 <br />0 <br />114 <br />9.7 <br />May <br />48.9 <br />5.34 <br />1.6 <br />3.8 <br />02 <br />151 <br />0 <br />0 <br />0 <br />15? <br />12.5 <br />Jun <br />48.9 <br />6.46 <br />1.1 <br />5.3 <br />0.5 <br />21.2 <br />0 <br />0 <br />0 <br />211 <br />16.3 <br />Jul <br />48.9 <br />6.68 <br />1.1 <br />5.6 <br />07 <br />32.1 <br />0 <br />0 <br />0 <br />22.1 <br />18.6 <br />Aug <br />489 <br />6.01 <br />1.2 <br />4.8 <br />(16 <br />18.8 <br />0 <br />0 <br />0 <br />18.8 <br />18.0 <br />Sep <br />489 <br />4.45 <br />0.9 <br />3.6 <br />0.4 <br />14.1 <br />0 <br />0 <br />0 <br />14.1 <br />155 <br />Oct <br />48.9 <br />3.12 <br />0.5 <br />2.6 <br />0.2 <br />10.5 <br />0 <br />0 <br />0 <br />10.5 <br />12.8 <br />Nov <br />48,9 <br />1.78 <br />0.6 <br />1,2 <br />0.0 <br />4.7 <br />0 <br />0 <br />0 <br />4.7 <br />91 <br />Dec 2015 <br />48.9 <br />1.34 <br />0.3 <br />1.1 <br />0 <br />4.4 <br />0 <br />0 <br />0 <br />44 <br />7,1 <br />Novl3 -Ju114 Total <br />- <br />30.94 <br />7.3 <br />23.6 <br />1.7 <br />94.5 <br />0 <br />580,00 <br />17.1 <br />111.6 <br />113.2 <br />?014 -2015 Total <br />44.52 <br />10.0 <br />34.5 <br />2 8 <br />137.9 <br />0 <br />460,000 <br />13.5 <br />151.4 <br />1561 <br />Au E -Dec 2015 Total <br />1 <br />16.70 <br />3.5 <br />13.2 <br />1 2 <br />52.5 <br />U <br />0 <br />0 <br />515 <br />62.4 <br />Notes <br />11) Total surface area of exposed ground water in Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit is conservatively projected to be 48 9 acres (20 6 acres at <br />Bromley Lakes Cell 2, 0 3 acres at Bromley Lakes Cell 3 and Lot 1, and 28 acres at North Tower Pit) <br />(2) Gross evaporation rate equals 44 52 inches (3 71 e) per year, based upon NOAA Evaporation Atlas Monthly distribution based upon SB -120 Guidelines <br />[3) Effective precipitation rate equals 70Qo of total precipitation, based upon average precipitation at the Brighton weather station <br />[4) Net evaporation equals [2] - (31 <br />[51 Historical ET credits at the North Tower Pit from 7 4 acres of pasture gross using ground water at a depth of 4 feet (does not include an effective precipitation credit) <br />[61 Net evaporation equals the net evaporation volume minus the historical ET credits, 11 ] ,x 14J 12.151 <br />(71 Production within a slurry wall lined pit (i a Ce113 Lot I or KML I) and outside of a slurry wall lined pit Since the exact timing of production within the slurry wall <br />lined pit is not known, projections conservatively show all production outside of a slurry wall lined pit <br />[81 Wash water and aggregate moisture content equals 21. by weight for gravel mined within a slurry wall lined pit and 40o by weight for gravel mined outside a slurry wall <br />lined pit <br />[91 Total evaporation and gravel mining depletion equals [61 . [8] <br />1101 Lagged site depletion equals the Bromley Lakes Cell 2, Cell 3, and Lot I and North Tower Pit evaporation and gravel depletion in column 191 lagged over 12 months <br />plus depletions from previous lagging patterns <br />rAL- BBA <br />
The URL can be used to link to this page
Your browser does not support the video tag.