My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-16_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-10-16_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:27 PM
Creation date
10/16/2013 8:48:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/16/2013
Doc Name
Request for Assistance & Attached Cost Estimate
From
Marcia Talvitie
To
Susan Burgmaier
Type & Sequence
SL13
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Push Highwall Block 2 into pit <br />Permit Action: Phase I/III Bond <br />Release SL -13 and <br />Site: New Horizon Mine PR -6 <br />PROJECT IDENTIFICATION <br />Task #: 02B State <br />Date: 12/18/2012 County <br />User: SLB <br />Colorado <br />Montrose <br />Permit/Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -02B <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9U <br />Horsepower: <br />405 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $498.84 <br />MATERIAL QUANTITIES <br />Initial Volume: 72,247 <br />Swell factor: 1.000 <br />Loose volume: 72,247 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />110 feet <br />1,227.1 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: -20 % <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $498.84 <br />MATERIAL QUANTITIES <br />Initial Volume: 72,247 <br />Swell factor: 1.000 <br />Loose volume: 72,247 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />110 feet <br />1,227.1 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: -20 % <br />Average site altitude: 5,700 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.