My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-16_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-10-16_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:27 PM
Creation date
10/16/2013 8:48:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/16/2013
Doc Name
Request for Assistance & Attached Cost Estimate
From
Marcia Talvitie
To
Susan Burgmaier
Type & Sequence
SL13
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />0.700 <br />(CAT HB) <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4878 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />380.04 LCY/hr <br />760.08 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.656/LCY <br />Total job time: <br />Total job cost: <br />152.21 Hours <br />$75,928.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.