My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-14_REVISION - C1981014 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2013-10-14_REVISION - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:35 PM
Creation date
10/15/2013 12:38:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/14/2013
Doc Name
Linda Saunders Hearing Request (Emailed)
From
Linda Saunders
To
DRMS
Type & Sequence
TR40
Email Name
DAB
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/13 State.co.us Executive Branch Mail - Fwd: Objection and Request for a Board Hearing re TR40 <br />TO:Division of Reclamation, Mining and Safety Staff <br />and Board <br />FROM: K2T LLC, Linda Saunders property owner <br />and manager <br />RE: Board Hearing on TR40 <br />In my July 18, 2013 Objection I requested a hearing <br />if the DMRS decides that Energy Fuels Coal Inc no <br />longer needs to monitor MWNW. Since I have <br />already requested that this issue me heard by the <br />board, I am reminding you that a hearing with the <br />Board is required. <br />EFCI needs to continue monitoring the mine <br />workings as part of their Hydrologic Plan according to <br />the DRMS regulations 4.05.13(1)(a), 4.05.13(1) <br />( c), 4.05.13(1)(e)e(I),4.05.13(3)(a) 4.0513(3)(b). <br />To not monitor would be non - compliance with these <br />regulations. <br />At the meeting with Janet and Dan in January 2012 <br />we asked that the DRMS enforce their own <br />regulations and stop the stipulations and Technical <br />Revisions at EFCI request. <br />Kent Gorham, the previous inspector in his 2009 <br />Annual Hydrology Review stated "Until water is <br />measured in MWNW (completed in the mine <br />workings, no conclusion regarding the ground water <br />(filling the mine voids) and quality can be made. <br />Continued monitoring in accordance with the <br />approved plan may provide more definitive <br />information in the future. <br />Also Janet Binns cited and fined EFCI NOV CV -2013- <br />002. <br />EFCI damaged MWNW and has not removed a piece <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th =141 bd422efaa8cbe 2/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.