Laserfiche WebLink
10/15/13 State.co.us Executive Branch Mail - Fwd: Southfield Mine: MWNW & Pond 4 <br />detailed description, with appropriate drawings, of permanent <br />entry seals and down -slope barriers designed to ensure stability <br />under anticipated hydraulic heads developed while promoting mine <br />inundation after mine closure for the proposed permit area and <br />adjacent area. <br />OUR OPINION AND REQUESTS REGARDING MWNW: <br />From Mr. Aber's email dated October 7, 2013: <br />"It is the Division's opinion that it would be a mistake to put water sampling equipment in the <br />well and attempt to pass it by the obstruction (the block of wood). " <br />Mr. Zuber, I totally agree with your statement however due to the inability <br />to put water sampling equipment in MWNW you need to further detail whether <br />EFCI is required to repair or replace the well so that monitoring equipment can <br />monitor water quality and quantity in compliance with the above listed Guidelines <br />and Bond Release Requirements. The Notice of Violation CV- 2013 -002 issued to <br />Energy Fuels Coal Inc. on January 28, 2013 for the permittee's failure to ensure that <br />the well continues to function as designed was a correct analysis of the violation and <br />needs to be pursued until monitoring data for water quality and quantity shows <br />that compliance is complete. <br />POND 4: <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th =141 bcef852l d94a5 16/20 <br />