cc <br />&XI <br />V_ amec. <br />Note: An Amec field representative monitored structural fill material temperatures placed within the areas of fill <br />during all shifts. Average structural fill temperatures were above 32 °F. <br />Clay (SLF) Processing: <br />Cameron Site: Clay mining and processing continued during this reporting period. <br />Squaw Gulch Clay Borrow Site: Clay stockpiling occurred during this reporting period. <br />Underdrain System: <br />Secondary Underdrain: No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Temporary Underdrain: No work was performed on the temporary underdrain during this reporting period. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters paused operations until further notice. <br />B) Underground Workings <br />Confirmatory drilling was performed on underground working No. 6167 and No. U6273. All drill hole locations were <br />established on a 4 -foot center isolating any voids found. Further remediation efforts will be ongoing until remediated. <br />Summary of the remediation efforts will follow 100% remediation. <br />Underground Working No. 6147 was 100% remediated with a two layer Geo -grid system. <br />Underground Working No. 6051 was 100% remediated with a concrete plug and Cap. <br />No other sites were remediated during this reporting period. <br />C) Highway 67 <br />Schmidt Construction continued hauling and placing Aggregate Base Course (ABC) material from the Schmidt Pit <br />located near Fountain, Colorado. During the reporting period Schmidt completed the placement and compaction of <br />the ABC (Class 6) materials. Final proof roll will be determined during the next reporting period; progress was <br />slowed due to weather conditions. <br />Schmidt's equipment consisted of a John Deere 310SG combination loader, A John Deere 672D grader, a Cat <br />CS56 vibratory, 10 -ton, smooth -drum roller, and a Cat 938G loader. <br />Material was cut from the north side of the existing Highway 67 near station 1029 +00 on the realignment by a Cat 330 <br />excavator and a Cat D8T (GPS) dozer. The material was loaded into tandem dump trucks and hauled directly across the <br />Highway 67 roadway and used as fill. The fill was placed in approximately 24 inch lifts with a Cat D6 dozer and compaction <br />was achieved utilizing a smooth -drum roller by method specification. <br />Approximately 6 inch thick layer of topsoil continue to be placed on the lower portion of the downstream slope of the <br />Highway 67 Realignment Embankment. A Cat D8T and Cat D6N (GPS) dozer placed the material working from the <br />bottom up. The material was loaded by a Cat 320 excavator into a Cat 740 haul truck from the topsoil stockpile <br />located next to the underdrain detention ponds. Topsoil placement is expected to continue. <br />Passe 2 of 7 MLE2 WE 09.14.13.doc <br />