Laserfiche WebLink
October 1, 2013 C-1981-035/King Coal Mine MLT <br /> • Care should also be taken to ensure that no coal mine waste is allowed to reach the clean <br /> water diversion ditch that parallels the pile on the north. It is also advisable to prevent coal <br /> mine waste from being spilled over the front face of the pile that has been already topsoiled <br /> and seeded. <br /> • The portal bench at King I will likely be utilized to establish the diversion ditch around the <br /> proposed coal mine waste disposal area. The bench was clear and dry. <br /> • The area below the King I highwall was significantly drier than it was during the previous <br /> inspection. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were issued as a result of this inspection, and none are pending. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: I Page 4 of 9 <br />