Laserfiche WebLink
September 30,2013 C-1992-080/Carbon Junction Mine MLT <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were issued as a result of this inspection. CV-2013-005 is currently <br /> active. <br /> Infraction Number: CV2013005 <br /> Inspection Date: April 30,2013 <br /> Date Issued: May 28,2013 <br /> Primary Topic: Hydrologic Balance <br /> Secondary Topic: <br /> Tertiary Topic: <br /> Description: Failure to Minimize Damage to the Prevailing Hydrologic Balance within the Permit Area. <br /> Abatement#: 1 <br /> Abatement Due Date: 7/1/2013 <br /> Abatement Due Extended Date: 9/12/2013 (Abated on 9/4/2013) <br /> Abatement Description: Submit a complete Technical Revision to the permit that accurately represents <br /> the as-built configuration of the Carbon Junction Permanent Diversion,with supporting design details per <br /> Rule 4.05.3. This revision shall also include an updated, accurate post-mining topography map for the <br /> entire permit area and a map delineating the Carbon Junction drainage area. <br /> Abatement#: 2 <br /> Abatement Due Date: 7/1/2013 <br /> Abatement Due Extended Date: 9/12/2013 (Abated on 9/4/2013) <br /> Abatement Description: Submit a complete Technical Revision to the permit that presents designs and <br /> plans for reestablishment of the Upper Carbon Junction Channel,including the un-named tributary that <br /> enters the drainage from the east, and reclamation and stabilization of the Carbon Junction Temporary <br /> Diversion and gully erosion. [The Upper Carbon Junction channel segment runs from the undisturbed <br /> channel upstream of the North Pit down to the beginning of the rip-rapped Carbon Junction Permanent <br /> Diversion,a distance of approximately 1900 feet.] <br /> Abatement#: 3 <br /> Abatement Due Date: 8/21/2013 <br /> Abatement Due Extended Date: 11/22/2013 <br /> Abatement Description: Repair and stabilize the gully erosion that has formed in the Carbon Junction <br /> Temporary Diversion, according to the approved plan required by Abatement Step 42. <br /> Abatement#: 4 <br /> Abatement Due Date: 8/21/2013 <br /> Abatement Due Extended Date: 11/22/2013 <br /> Abatement Description: Reestablish the Upper Carbon Junction Channel, including the un-named <br /> tributary that enters the drainage from the east, according to the approved plan required by Abatement <br /> Step 92. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 Page 5 of 11 <br />