My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1982056 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
_INSPECTION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 9:09:46 AM
Creation date
10/7/2013 1:12:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Jerry Nettleton
Inspection Date
8/28/2013
Email Name
JDM
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 28,2013 C-1982-056/Foidel Creek Mine JDM <br /> - The erosion control fabric at northwest portion of the pad has been damaged and will require maintenance. <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> Refuse material continues to be placed in the RDA expansion area. Material has been stockpiled towards the <br /> middle of the Phase 1 area of the RDA expansion area and approximately midway in the RDA with evidence of <br /> grading having been conducted during the inspection. The RDA was well compacted and stable at the time of the <br /> inspection. The refuse material had not yet reached the head of the under-drain of the RDA. The exposed under- <br /> drain was stable and constructed as designed. Phase 1 of the RDA expansion is nearing completion. TR67 was <br /> approved with a stipulation that future bonding for each phase of construction will be required prior to the <br /> initiation of the next Phase. <br /> The first bench has been completed and the second bench is near elevation. The out slope of the first bench is <br /> stable and the outslope of the second bench is stable. Piezometers will be installed during the summer of 2013 in <br /> the RDA <br /> The underdrain outlet was draining into the Pit Area Pond as designed. Evidence of weed management along the <br /> west side of the RDA was observed. <br /> Refuse Disposal Area Expansion <br /> RDA Expansion Underdrain <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.