My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-02_REVISION - M2010082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010082
>
2013-10-02_REVISION - M2010082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:44 PM
Creation date
10/4/2013 5:49:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010082
IBM Index Class Name
REVISION
Doc Date
10/2/2013
Doc Name
Adequacy review No 1 AM01
From
DRMS
To
Lincoln County
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />r <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />COLORADO O <br />Phone: (303) 866 -3567 <br />RECLAMATION <br />FAX: (303) 832 -8106 <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />October 2, 2013 <br />Governor <br />Mike King <br />John DeWitt Executive Director <br />Lincoln County Loretta E. Pineda <br />103 3rd Ave. Director <br />P.O. Box 39 <br />Hugo, CO 80821 <br />RE: Jamaco Pit; DRMS File No. M- 2010 -082; Adequacy Review No. 1 (AM01) <br />Dear Mr. DeWitt, <br />The Division of Reclamation, Mining and Safety has completed its preliminary adequacy review of your <br />110 Construction Materials Reclamation Permit Amendment Application. The application was received <br />on September 10, 2013 and called complete for review on September 30, 2013. The decision date for this <br />application is October 30, 2013. Please be advised that if you are unable to satisfactorily address any <br />concerns identified in this review before the decision date, it will be your responsibility to request <br />an extension of the review period. If there are outstanding issues that have not been adequately <br />addressed prior to the end of the review period, and no extension has been requested, the Division <br />will deny this application. <br />The review consisted of comparing the application content with specific requirements of Rule 6.1, 6.2, <br />6.3, and 6.5 of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for <br />the Extraction of Construction Materials. In general the application was substantially adequate, however, <br />as with most applications there are a few items that will require the submittal of additional information or <br />clarification of the existing information. Inadequacies are identified under the respective exhibit heading <br />along with suggested actions to correct them. <br />6.3.1 Exhibit A — Legal Description and Location Map <br />1. As required by Rule 6.3.1(2), please provide the coordinates for the mine site entrance. Coordinates <br />may be specified as latitude and longitude in degrees, minutes and seconds or in decimal degrees to <br />an accuracy of at least five decimal places. <br />6.3.2 Exhibit B — Site Description <br />No comment. <br />6.3.3 Exhibit C — Mining Plan <br />2. The area to be added to the permit boundary is adjacent to Hackberry Creek. As required by Rule <br />6.3.3, please provide a description of how stormwater will be managed at the site and will be <br />prevented from entering Hackberry Creek. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.