My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-11_INSPECTION - M2006017
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2006017
>
2013-02-11_INSPECTION - M2006017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:01 PM
Creation date
10/4/2013 5:46:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006017
IBM Index Class Name
INSPECTION
Doc Date
2/11/2013
Doc Name
Reduction in Financial Warranty for succession of Operations revision Approval
From
DRMS
To
Premier Silica Sand
Inspection Date
2/11/2013
Email Name
BJC
AJW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />EQUIPMENT MOB ILIZATION/DEMOBILIZATION <br />Task description: Mob. demob <br />Permit Action: SO warranty <br />Site: Jemadojin Sand Mine calculation Permit/Job #: M2006017 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 2/8/2013 _ County: El Paso <br />User: BMK <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: M017 -004 <br />Shift basis: 1 per day _ <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities _ <br />0 -25 Tons <br />26 -50 Tons_ <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />_ <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$25.39 <br />_ _ <br />$27.66 <br />$25.39 <br />Helper Cost/flour: <br />_____$27.66 <br />$0.00 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost/hr/ unit Cost/hr /unit Size Cost/hr/ Cost/hr/ fleet Cost/ fleet <br />(TONS) _ _ fleet _ <br />dozer_ 52.83 $63.92 $125.45 1 $189.37 $125.45 $250.00 <br />Subtotals: 89.37 $125.45 $250.00 _ I <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Return Trip 1 <br />Cost/hr/ fleet <br />Cost/hr/ fleet <br />Subtotals: C $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.