Laserfiche WebLink
Mobilization Worksheet Cont'c. Task # 004 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost *'` <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non- Roadable <br />Equipment <br />Roadable <br />Equipment _ <br />0.17 <br />0.17 <br />0.17 <br />0.17 <br />0.00 <br />0.00 <br />_NA <br />NA <br />0.33 <br />0.33 <br />Page 2 of 2 <br />___ HANOEVER <br />5.00 miles <br />_30.00__ mph <br />$604.94 <br />$0.00 <br />Total job time: 0.67 Hours <br />Total job cost <br />$604.94 <br />CIRCES Cost Estimating Software <br />