Laserfiche WebLink
Page 2 of 2 <br />Frequency <br />• The only data for Wells 91 MOO 1 and 91M004 is for September, but the schedule (Table 1 in <br />2012 AHR) is semi - annually. Please explain this discrepancy. <br />• Sites SW -13 and SW -15 were sampled more often than required. <br />• Site 29 was only sampled once in April but the schedule is for twice in April. Please explain <br />this discrepancy. <br />• The data for Sites 800, 8, and 14 indicate "dry" in August and September, but it is unclear if <br />these sites were visited four times in August and twice in September. Please revise this table to <br />present this information clearly. <br />Please feel free to contact me with any questions at (303) 866 -3567 ext 8134. <br />Sincerely, <br />Jason Musick <br />Environmental Protection Specialist <br />