My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_PERMIT FILE - M2013056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013056
>
2013-10-01_PERMIT FILE - M2013056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:48 PM
Creation date
10/2/2013 8:27:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013056
IBM Index Class Name
PERMIT FILE
Doc Date
10/1/2013
Doc Name
Adequacy Response
From
Richard Fretterd
To
DRMS
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C: Mining Plan <br />(a) Mining will commence upon approval and will continue for 10 years. Mining activities <br />will be seasonal, occurring less than 180 days per year on affected land. If operations are <br />to continue beyond 10 years, a request for continuance will be submitted with DRMS. <br />(b) Top soils will be stockpiled for reclamation where found. <br />(c) Overburden will be stockpiled separate from topsoil. <br />(d) Deposit thickness will vary from one to thirty feet in depth. <br />(e) Four to five digging targets have been identified (see Exhibit E.) <br />(f) The total mining disturbance will not exceed 9.9 acres, with a maximum of two acres <br />affected at any one time. The work area around excavations will be benched to <br />accommodate overburden and topsoil piles and be used as a safety barrier during <br />digging activities. <br />(g) An existing road (FR201) will be used for mine access. <br />(h) No water will be used during mining operations. <br />(i) No groundwater or surface water will be disturbed during mining operations. <br />0) Not applicable. <br />(k) No toxic or acid forming materials are expected. If encountered, DRMS will be <br />consulted. <br />(1) This operation is not expected to have any affect on the hydrologic balance. After <br />mining, all excavations will be replaced, contoured and reclaimed to as stable condition <br />as pre- mining conditions. <br />(m) Minerals will be processed off -site. <br />(n) The commodity to be mined is mineral specimens including amazonite, smoky quartz, <br />fluorite and other related minerals. <br />(o) No explosives will be used at this operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.