My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />4. The locations of all destructive tests performed on the geomembrane liner system. <br />C. The Colorado licensed surveyor will provide a surveyor's certificate to be submitted in the Construction <br />Certification Report. <br />D. Submittals <br />CONTRACTOR will submit completed as -built documentation within seven (7) calendar days <br />upon completion of the work in the following manner: <br />a. Submit two (2) hard copies to the MANAGER. <br />b. Submit two (2) non - reproducible copies to the MANAGER in electronic form on compact <br />disks (CD) or DVD's and in an AutoCAD compatible format. <br />E. The CONTRACTOR will be responsible for performing the following survey activities associated <br />with the Construction Certification Report <br />Provide northing, easting, and elevation for geomembrane panel intersections and destructive <br />samples. <br />2. Provide northing, easting, and elevation for GCL panel intersections. <br />3. Provide northing, easting, and elevation for geotechnical field testing and sampling locations. <br />F. Provide depth verification for Drain Cover Fill on a 50 -foot by 50 -foot grid with additional survey <br />points at all breaks in grade. <br />G. Northings, eastings, and elevations for Items 1, 2, and 3 will be performed on a daily basis and results <br />will be provided to the MANAGER in both electronic and hardcopy format within 24 hours of <br />performing the survey. <br />END OF SECTION 01050.0 <br />Construction Staking and Documentation August 28, 2013 <br />01050.0 -2 Revision 0 <br />S \Projects \1550 - CC&:V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Specificahons\PSES Pipe Rack Liner Extension Specifications \01050 0 Construction Staking and <br />Documentation docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.