My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />SECTION 01400.1 <br />EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />PART 1 - INTRODUCTION <br />This plan addresses the Construction Quality Assurance (CQA) procedures for the installation of the earthwork <br />components of the PSES Pipe Rack Liner Extension at the Cresson Project, Teller County, Colorado. This program <br />has been developed to assure that the construction of the soil components are in compliance with the project <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are achieved. The <br />objective of this plan is to assure that proper materials, construction techniques, and procedures are followed by the <br />CONTRACTOR and that the intent of the design is met. This plan also provides the means for resolution of <br />problems that may occur during construction. This plan addresses quality assurance, not quality control. This CQA <br />Plan is independent of the quality control (QC) programs conducted by CONTRACTOR. The intent of the CQA <br />Plan is to provide independent third party verification and testing, to demonstrate that the CONTRACTOR has met <br />its obligations in the supply and installation of earthwork (soils) materials according to the design, project <br />SPECIFICATIONS, contractual, and regulatory requirements. Quality control is provided by CONTRACTOR and <br />refers to those actions taken by the CONTRACTOR to ensure that materials and workmanship meet the <br />requirements of the DRAWINGS and SPECIFICATIONS. <br />PART 2 - EXECUTION <br />2.1 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including their responsibilities and <br />qualifications. <br />A. CC &V <br />In this CQA Plan, CC &V refers specifically to Cripple Creek & Victor Gold Mining Company. <br />B. MANAGER <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor <br />Gold Mining Company. MANAGER is the official representative of CC &V and is responsible <br />for all construction activities including oversight and direction during construction. MANAGER <br />is also responsible for coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction <br />and resolution meetings. As communications coordinator, MANAGER will serve as a liaison <br />between all parties involved in the project to ensure that ongoing communications are maintained. <br />MANAGER and CERTIFYING ENGINEER shall be responsible for the resolution of all CQA <br />issues. Duties for this position include the following: <br />a. Review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the <br />Pipe Rack Liner Extension; <br />b. Preconstruction coordination with the CQA MONITOR to ensure that the CQA <br />MONITOR has performed similar reviews of the DRAWINGS and SPECIFICATIONS to <br />ensure that the CQA Plan can be implemented; <br />C. Coordination of all construction activities associated with CONTRACTOR; <br />d. Scheduling and coordinating construction activities with required CQA testing and activities; <br />e. Overseeing the construction quality control operations performed by CONTRACTOR; <br />Earthworks Construction Quality Assurance (CQA) Plan September 24, 2013 <br />01400.1 -1 Revision I <br />S \Projects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Speafications\PSES Pipe Rack Liner Extension Specifications \Individual Specification <br />Sections \01400 1 RI Earthworks CQA docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.